Study on the Evolution of Risk Contagion in Urban River Ecological Management Projects Based on SEIRS

Junke Xu    
Jiwei Zhu and Jiancang Xie    

Resumen

The risk transmission mechanisms of urban river ecological management engineering projects are examined in this study. Using the Susceptible Exposed Infectious Recovered Susceptible (SEIRS) model for risk transmission, a model of risk propagation delay for urban river ecological management engineering projects on scale-free networks is developed, which takes into account the effects of risk propagation and delay. We conducted a steady-state analysis of the model and obtained the basic reproduction number R. When R > 1, the equilibrium point of risk outbreak is stable, and when R < 1, the equilibrium point of risk disappearance is stable. Numerical simulations of the model were conducted using the MATLAB2022b to reveal the dynamic propagation patterns of risk in urban river ecological management engineering projects. The research results show that the steady-state density of the infected nodes in the network increases with the increase in the effective propagation rate and the propagation delay time; the propagation delay reduces the risk propagation threshold in the network and accelerates the occurrence of the equilibrium state of risk outbreak. There is a correlation between the transmission rate of latent nodes and the transmission rate of infected nodes, and the effective transmission rate of latent nodes has a greater influence on risk propagation. The spread of risk in the network can be effectively controlled and mitigated with targeted immunity for susceptible nodes. This article, based on the theory of complex networks and the mean-field theory, takes into account the propagation delay and spreading of latent nodes. Building a D-SEIRS model for risk propagation broadens the research perspective on urban river ecological management risk propagation.

 Artículos similares

       
 
Cong Liu, Hui Zeng and Jiming Cao    
Prefabricated construction (PC) is considered to be a low-carbon construction method. Implementing prefabricated construction projects (PCPs) requires multiple industry organizations to participate and collaborate. As different PCPs are initiated and imp... ver más
Revista: Buildings

 
Lidong Zhang, Zhengcong Feng, Yuze Zhao, Xiandong Xu, Jiangzhe Feng, Huaihui Ren, Bo Zhang and Wenxin Tian    
During the expansion of a wind farm, the strategic placement of wind turbines can significantly improve wind energy utilization. This study investigates the evolution of wake turbulence in a wind farm after introducing smaller wind turbines within the ga... ver más

 
Yan Xi, Junhao Xing, Jiajia Feng, Congming Ma, Xiutian Yang, Yudong Tian and Xin Liu    
Cement has been widely used as a structural material in many underground projects, and these projects often face high- or ultra-high-temperature environments, leading to the deterioration of the mechanical, porosity, and permeability properties of set ce... ver más
Revista: Buildings

 
Qihang Li, Yunmin Wang, Xiaoshuang Li and Bin Gong    
This research examines how rainfall and mining affect the slope damage resulting from the transition from open-pit mining to underground mining. Using an unmanned aerial vehicle (UAV), the Huangniu slope of the Dexing Copper Mine was fully characterized,... ver más
Revista: Water

 
Zihan Gui, Heshuai Qi, Faliang Gui, Baoxian Zheng, Shiwu Wang and Hua Bai    
Poyang Lake, the largest freshwater lake in China, is an important regional water resource and a landmark ecosystem. In recent years, it has experienced a period of prolonged drought. Using appropriate drought indices to describe the drought characterist... ver más
Revista: Water