Inicio  /  Applied Sciences  /  Vol: 13 Par: 16 (2023)  /  Artículo
ARTÍCULO
TITULO

Linear Project-Scheduling Optimization Considering a Reverse Construction Scenario

Ze Yu    
Chuxin Wang    
Yuanyuan Zhao    
Zhiyuan Hu and Yuanjie Tang    

Resumen

The linear scheduling method (LSM) for optimization in linear projects has been the focus of numerous academic studies over the years. However, research on incorporating reverse construction activities and other practical scenarios, such as flexible activity?section?crew assignment demands, in linear project-scheduling optimization remains insufficient. This has further spurred research on practical scenario-based linear project-scheduling optimization. We performed an analysis of a description method system within the LSM framework, outlining the spatiotemporal logical relationship in scenarios involving reverse activities. A scheduling optimization model incorporating a flexible constraint system, capable of handling multisection?multicrew, multicrew?multimode, and multicrew?multiconstruction direction scenarios is developed to enhance the practicability of linear project-scheduling optimization. Additionally, an advanced grey wolf optimization (GWO) algorithm is devised and validated through a real-world case study. The case study provides insights into the impact of reverse construction activities on the linear project-scheduling problem, specifically in the dimension of project duration.

 Artículos similares

       
 
Xiaobin Qian, Helong Shen, Yong Yin and Dongdong Guo    
In this paper, we present a novel nonlinear model predictive control (NMPC) algorithm based on the Laguerre function for dynamic positioning ships to solve the problems of input saturation, unknown time-varying disturbances, and heavy computation. The no... ver más

 
Suryakant Tyagi and Sándor Szénási    
Machine learning and speech emotion recognition are rapidly evolving fields, significantly impacting human-centered computing. Machine learning enables computers to learn from data and make predictions, while speech emotion recognition allows computers t... ver más
Revista: Algorithms

 
Jianying Wei, Yuming Liu, Xiaochun Lu, Yu Feng and Yadi Wang    
Tunnel construction projects are a classic type of repetitive project, and hold a crucial position in the construction industry. The linear scheduling method (LSM) has been in the spotlight in scheduling optimization for repetitive construction projects ... ver más
Revista: Applied Sciences

 
Guido Saccone and Marco Marini    
In the framework of the ?Multidisciplinary Optimization and Regulations for Low-boom and Environmentally Sustainable Supersonic aviation? project, pursued by a consortium of European government and academic institutions, coordinated by Politecnico di Tor... ver más
Revista: Aerospace

 
Jiacun Wang, Guipeng Xi, Xiwang Guo, Shujin Qin and Henry Han    
The scheduling of disassembly lines is of great importance to achieve optimized productivity. In this paper, we address the Hybrid Disassembly Line Balancing Problem that combines linear disassembly lines and U-shaped disassembly lines, considering multi... ver más
Revista: Information