Inicio  /  Applied Sciences  /  Vol: 10 Par: 17 (2020)  /  Artículo
ARTÍCULO
TITULO

Predictive Scheduling with Markov Chains and ARIMA Models

Lukasz Sobaszek    
Arkadiusz Gola and Edward Kozlowski    

Resumen

Production scheduling is attracting considerable scientific interest. Effective scheduling of production jobs is a critical element of smooth organization of the work in an enterprise and, therefore, a key issue in production. The investigations focus on improving job scheduling effectiveness and methodology. Due to simplifying assumptions, most of the current solutions are not fit for industrial applications. Disruptions are inherent elements of the production process and yet, for reasons of simplicity, they tend to be rarely considered in the current scheduling models. This work presents the framework of a predictive job scheduling technique for application in the job-shop environment under the machine failure constraint. The prediction methods implemented in our work examine the nature of the machine failure uncertainty factor. The first section of this paper presents robust scheduling of production processes and reviews current solutions in the field of technological machine failure analysis. Next, elements of the Markov processes theory and ARIMA (auto-regressive integrated moving average) models are introduced to describe the parameters of machine failures. The effectiveness of our solutions is verified against real production data. The data derived from the strategic machine failure prediction model, employed at the preliminary stage, serve to develop the robust schedules using selected dispatching rules. The key stage of the verification process concerns the simulation testing that allows us to assess the execution of the production schedules obtained from the proposed model.

 Artículos similares

       
 
Manuela Sechilariu    
Smart grid implementation is facilitated by multi-source energy systems development, i.e., microgrids, which are considered the key smart grid building blocks. Whether they are alternative current (AC) or direct current (DC), high voltage or low voltage,... ver más
Revista: Applied Sciences

 
Mandana Shaygan, Brent Usher and Thomas Baumgartl    
Accurate scheduling of bauxite residue (red mud) deposition time is required in order to prevent the risk of storage facility failure. This study was conducted to precisely determine the hydraulic parameters of bauxite residue and investigate the capabil... ver más
Revista: Water

 
Xiaogang Guo, Zhejing Bao and Wenjun Yan    
Recently, the increasing integration of electric vehicles (EVs) has drawn great interest due to its flexible utilization; moreover, environmental concerns have caused an increase in the application of combined heat and power (CHP) units in multi-energy s... ver más
Revista: Applied Sciences