ARTÍCULO
TITULO

MODELLING THE FLEXIBLE SCHEDULES OF WORK OF INDUSTRIAL ENTERPRISES MANAGERS

Evgen Didenko    

Resumen

The subject matter of the article is analyzing ways of using the potential capabilities of managers of industrial enterprises to implement high-performance activities as a factor of direct influence on the state and nature of the relationship between an employer and an employee. The goal is to build a model for flexible scheduling the work of enterprise managers that take into account the priority of solving production tasks in the subsystem of the personnel management of the decision support system for organizing the activities of an industrial enterprise. The objectives are to develop an economic and mathematical model that enables taking into account the rhythm of the fluctuations of the opportunities for achieving high results in the managerial activity and the activation of hidden potentials of managers by introducing flexible forms of managers? work into the scheduled plans of the production activities of industrial enterprises. The general scientific methods such as system analysis, structural analysis and specific network methods are used. The following results are obtained. The conceptual model of activating the efficiency of managers? production activities is suggested; the manager?s activities are activated by minimizing the involvement of managers in performing production tasks when the values of the indicators of managers? potential capabilities are low, which objectively reduces the productivity of managerial work. At the same time, it is suggested to use the manager?s capabilities at a time that coincides with the opportunities for high-performance work by adapting flexible schedules of managers? work to the requirements of the scheduled plans of an industrial enterprise. The integral indicator for assessing the impact of the rhythms of managers? activities on the state of their labour productivity is suggested for using in the models of organizing the activity of industrial enterprises. Recommendations are given to minimize the risks of disregarding the terms of employment contracts that are caused by the potential inability to obtain high indicators of managers? labour activities and to explain the advantages of using flexible schedules of managers? work to the representatives of an employer?s personnel services. Conclusions. Modelling of flexible schedules of the work of managers of industrial enterprises enables correcting the work of managers at an enterprise taking into account the wave character of managers? readiness for highly productive work according to the positive feedback principle. The recommendations for calculating the integral indicator of assessing the impact of the rhythms of managers? activities on the state of productivity of their work are given. The obtained results can be used to determine more specifically the obligations of employers and managers as the parties of labour relations to agree on the duration, regularity, and the rhythm of managers? performance of their work-related obligations.

Palabras claves

 Artículos similares

       
 
Ashraf Abdelkarim and Ahmed F.D. Gaber    
This study aims to assess the impact of flash floods in the Wadi Nu?man basin on urban areas, east of Mecca, which are subjected to frequent floods, during the period from 1988?2019. By producing and analyzing the maps of the regions, an integrated appro... ver más
Revista: Water

 
Rudi Uswarman, Swadexi Istiqphara, Rajif Agung Yunmar, Arkham Zahri Rakhman     Pág. 135 - 143
Sliding Mode Control (SMC) used to control the stability of a quadcopter from disturbances and uncertainties. This technique has two main advantages: the nonlinear dynamics and modelling errors of the quadcopter can be eliminated by switching function an... ver más

 
S. Rahma, R. A. E. Putra     Pág. 76 - 83
The main role of a transportation network is providing optimum services for transportation network. Over the time, the population is increasing and the needs of reliable transportation network also increased. Transportation network consists of node and c... ver más

 
Taufiq Saidi,Taufiq Saidi,Muttaqin Hasan,Muttaqin Hasan,Zahra Amalia,Muhammad Iqbal,Muhammad Iqbal     Pág. 155 - 164
The use of synthetic Fiber Reinforced Polymer (FRP) as a composite material is an alternative material that has been widely used for strengthening and repairing reinforced concrete structures. However, the high price is one of the obstacles in applying s... ver más

 
Bora Pulatsu, Rhea Wilson, Jose V. Lemos and Neboj?a Mojsilovic    
Unreinforced masonry (URM) walls are common load-bearing structural elements in most existing buildings, consisting of masonry units (bricks) and mortar joints. They indicate a highly nonlinear and complex behaviour when subjected to combined compression... ver más
Revista: Infrastructures