|
|
|
Dunqing Li, Feng Liao, Lixin Wang, Jianfu Lin and Junfang Wang
As urbanization accelerates, deep excavation projects have become increasingly vital in the construction of high-rise buildings and underground facilities. However, the potential risks to the surrounding environment and the inherent complexities involved...
ver más
|
|
|
|
|
|
Wenhua Yuan, Lianjie Ji, Long Meng, Min Fang and Xiangchi Zhang
Pervious concrete is an innovative eco-friendly construction material. Through the application of mineral admixtures and microscopic analysis to optimize its performance and analyze its mechanisms, its traits as a sustainable building option may be furth...
ver más
|
|
|
|
|
|
Paula Martin-Goñi, Jaume Avellaneda and Josep María González
The aim of this paper is to explore the rehabilitation strategies for multi-family dwellings on the level of function and techniques. The study employs its own methods of analysis using a sample of selected cases as a reference. Nearly 20% of EU building...
ver más
|
|
|
|
|
|
Honglong Ma, Huawei Li, Jinhu Zheng, Wei Wei, Shaohua He, Xiaopeng Tian, Xiaohui Li and Feng Liu
The application range of rubber-recycled aggregate concrete (RRAC), a new type of green building material, is currently limited due to performance defects, including low hardness, high water absorption, and poor adhesion. To expand its application in rei...
ver más
|
|
|
|
|
|
Fan Ding, Min Liu, Simon M. Hsiang, Peng Hu, Yuxiang Zhang and Kewang Jiang
The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework bas...
ver más
|
|
|