Inicio  /  Buildings  /  Vol: 9 Núm: 2 Par: Februar (2019)  /  Artículo
ARTÍCULO
TITULO

Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry

 Artículos similares

       
 
Fahad Alqahtani, Mohammed Almutairi and Frederick T. Sheldon    
This study provides a comprehensive review and comparative analysis of existing Information Flow Tracking (IFT) tools which underscores the imperative for mitigating data leakage in complex cloud systems. Traditional methods impose significant overhead o... ver más
Revista: Future Internet

 
Li Li and Kyung Soo Jun    
River flood routing computes changes in the shape of a flood wave over time as it travels downstream along a river. Conventional flood routing models, especially hydrodynamic models, require a high quality and quantity of input data, such as measured hyd... ver más
Revista: Water

 
Ziyad Almudayni, Ben Soh and Alice Li    
The advent of the Internet of Things (IoT) has revolutionised our interaction with the environment, facilitating seamless connections among sensors, actuators, and humans. Efficient task scheduling stands as a cornerstone in maximising resource utilisati... ver más
Revista: Future Internet

 
Nasour Bagheri, Ygal Bendavid, Masoumeh Safkhani and Samad Rostampour    
A smart grid is an electricity network that uses advanced technologies to facilitate the exchange of information and electricity between utility companies and customers. Although most of the technologies involved in such grids have reached maturity, smar... ver más
Revista: Future Internet

 
Christian Haas, Philipp Klaus Thumser, Michael Hellmair, Tyler J. Pilger and Martin Schletterer    
With the globally increasing awareness regarding the interconnectivity between freshwater ecosystems, projects for re-establishing connectivity with fishways as well as stock management are increasing. To ensure the quality and impact of such projects an... ver más
Revista: Water