7   Artículos

 
en línea
Jiaqi Hu, Yin Gu, Jinhuang Yan, Ying Sun and Xinyi Huang    
With the convenient and fast requirements for construction in bridge engineering, prefabricated assembly technology is widely applied in engineering construction. Typically, prefabricated bridge decks are connected through cast-in-place wet joints. Wet j... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Fengli Zhou, Chunwu Guo, Jiangtao Zhang, Jincen Guo, Jinlong Jiang and Lulin Ning    
Assembled steel-composite bridges generally use stud connectors to achieve the connection between the deck slab and the steel main girders. However, the commonly-used cluster studs weaken the integrity of the precast deck slabs and are not conducive to r... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Haena Kim, Byungkyu Moon, Xinyu Hu, Hosin (David) Lee, Gum-Sung Ryu, Kyung-Taek Koh, Changbin Joh, Byung-Suk Kim and Brian Keierleber    
The application of Ultra-High-Performance Concrete (UHPC) materials in rehabilitating bridges and constructing primary bridge components is increasing rapidly across the world because of their superior strength and durability characteristics when compare... ver más
Revista: Infrastructures    Formato: Electrónico

 
en línea
Islam Mantawy, Rahulreddy Chennareddy, Moneeb Genedy and Mahmoud Reda Taha    
Prefabricated concrete bridge deck panels are utilized in Accelerated Bridge Construction (ABC) to simplify bridge deck construction. Concrete with good bond and shear strength as well as excellent flowability is required to fill bridge deck closure join... ver más
Revista: Infrastructures    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »