|
|
|
Xiaobang Wang, Yang Yu, Siyu Li, Jie Zhang and Zhijie Liu
The Revolving Floating Crane (RFC) is a specialized engineering vessel crucial for offshore lifting operations, such as offshore platform construction and deep-water salvaging. It boasts impressive lifting capacity, good adaptability to various environme...
ver más
|
|
|
|
|
|
|
Jan Oellerich and Keno Jann Büscher
In this paper, an alternative design approach to the construction of bridge crane systems is analyzed with respect to the potentials and challenges of use based on two possible construction methods. Compared to conventional crane bridges, which are manuf...
ver más
|
|
|
|
|
|
|
Yongsheng Yang, Shu Sun, Meisu Zhong, Junkai Feng, Furong Wen and Haitao Song
A U-shaped automated container terminal (ACT) has been proposed for the first time globally and has been adopted to construct the Beibu Gulf Port ACT. In this ACT layout, the double cantilevered rail crane (DCRC) simultaneously provides loading and unloa...
ver más
|
|
|
|
|
|
|
Ying Yang, Bo Shao, Lianghai Jin and Xiazhong Zheng
Tower crane safety governance is an important issue related to the sustainable development of China?s construction industry. The complex collaborative relationship among stakeholders determines the efficiency of tower crane safety governance. From the pe...
ver más
|
|
|
|
|
|
|
Ridwan Taiwo, Mohamed Hussein and Tarek Zayed
Many nations across the globe face the challenge of housing deficit. Modular integrated construction (MiC), which has the highest level of prefabrication among off-site construction manufacturing (OSM), has been adopted as a fast and reliable constructio...
ver más
|
|
|
|
|
|
|
Junwu Wang, Feng Guo, Yinghui Song, Yipeng Liu, Xuan Hu and Chunbao Yuan
Prefabricated buildings that are more environmentally friendly have been vigorously promoted by the Chinese government because of the reduced waste and carbon emissions during the construction process. Most of the construction processes of prefabricated ...
ver más
|
|
|
|
|
|
|
Meixian Jiang, Jian Zhou, Jiajia Feng, Lin Zhou, Fangzheng Ma and Guanghua Wu
In this work, we study the integrated berth and crane scheduling problem in a tidal port with multiple terminals, considering the uncertainties, tides, maximum coverage of cranes and interference between cranes. For coping with the uncertainties, a certa...
ver más
|
|
|
|
|
|
|
Fan Zhou, Jing Liu, Hang Zhu, Xiaodong Yang and Yunli Fan
The lack of techniques for monitoring ship emissions all day and in all weather conditions to obtain real-time emission factor values is the main problem in understanding the characteristics of ship emissions, and there is still no perfect solution. In t...
ver más
|
|
|
|
|
|
|
Hosang Hyun, Moonseo Park, Dowan Lee and Jeonghoon Lee
Modular construction, which involves unit production in factories and on-site work, has benefits such as low cost, high quality, and short duration, resulting from the controlled factory environment utilized. An efficient tower crane lifting plan ensures...
ver más
|
|
|
|
|
|
|
Thomas Danel, Zoubeir Lafhaj, Anand Puppala, Sophie Lienard and Philippe Richard
This article proposes a methodology to measure the productivity of a construction site through the analysis of tower crane data. These data were obtained from a data logger that records a time series of spatial and load data from the lifting machine duri...
ver más
|
|
|
|