5   Artículos

 
en línea
A.A.A Made Cahaya Wardani,I Nyoman Arya Thanaya,Nyoman Yudha Astana,A.A. Gde Agung Yana     Pág. 1 - 14
Cost, quality and time are an important performance indicators in the project success. To achieve these objectives various risks are faced in each project life cycle. One of these risks is supply chain risk, which must be managed properly, doe to the unc... ver más

 
en línea
I Nyoman Arya Thanaya     Pág. pp. 64 - 69
This paper describes investigation on the performances of cold asphalt emulsion mixes (CAEMs). The type of emulsion used was a cationic asphalt emulsion. The investigation was carried out at Leeds University, United Kingdom (UK). The objective of the exp... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
I Nyoman Arya Thanaya     Pág. pp. 49 - 56
Note from the EditorCold Asphalt Emulsion Mixture (CAEM) is a mixture of aggregates and asphalt emulsion that is mixed at room temperature. It is relatively simple to produce, but the design procedure provided by the Asphalt Institute and the Ministry of... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »