|
|
|
Shamnath Thajudeen, Fredrik Elgh and Martin Lennartsson
|
|
|
|
|
|
|
Mohd Affendi Ahmad Pozin,Mohd Nasrun Mohd Nawi,Md Azree Othuman Mydin,Salman Riazi Mehdi Riazi,Ayub Ilfandy Imran
Pág. pp. 188 - 197
In this article, we discuss about WhatsApp application practise around project managers in managing IBS construction projects. The WhatsApp application offera great advantages, especially in collecting, managing information and data in a timely manner. P...
ver más
|
|
|
|
|
|
|
Muhamad Faiz Musa,Mohd Reeza Yusof,Noor Sahidah Samsudin,Faridah Muhamad Halil
Pág. 105 - 113
The enhancement of quality and to promote sustainability in the construction or built environment can be achieved through the adoption of offsite manufacturing (OSM). The adoption OSM through modular construction is already being adopted all over the wor...
ver más
|
|
|
|
|
|
|
Mohd Reeza Yusof,Muhamad Faiz Musa,Noor Sahidah Samsudin,Mohammad Fadhil Mohammad,Mohd Nurfaisal Baharuddin
Pág. 299 - 305
Industrialised Building Systems (IBS) is a term used to describe construction method that produced building components manufactured in a factory, transported and assembled into a structure using appropriate machinery and equipment with minimal workers on...
ver más
|
|
|
|
|
|
|
Zul-Atfi Ismail,Azrul A. Mutalib,Noraini Hamzah
Pág. 28 - 35
The implementation of a maintenance management system faced many issues due to defect repetition and lack of proper structure management planning. A case study was undertaken among complex and high-rise Industrialised Building System (IBS) buildings in M...
ver más
|
|
|
|
|
|
|
Muhammad Azuan Anif Ghazali,Nur Fadhilah Bahardin,Mohd Azian Zaidi,Mohd Nurfaisal Baharuddin,Mohd Reeza Yusof
Pág. 204 - 208
Industrialised Building System (IBS) in Malaysia has been practiced for decades. The development of its formal practice parallels with the improvement of the built environment in the nation. One of the applications is on formwork. IBS plastic formwork ha...
ver más
|
|
|
|
|
|
|
Ani Saifuza Abd Shukor,Muhammad Fadhil Muhammad,Shamsida Saidan Khaderi,Faridah Muhammad Halil
Pág. 79 - 88
The shift to an integrated IBS construction approach requires enhanced supply chain integration to improve the productivity as well as the poor quality of human behavioual aspect in IBS project. This paper is to identify the challenges at each tier betwe...
ver más
|
|
|
|