Selecting an Appropriate Configuration in a Construction Project Using a Hybrid Multiple Attribute Decision Making and Failure Analysis Methods

Ali Beiki Ashkezari    
Mahsa Zokaee    
Amir Aghsami    
Fariborz Jolai and Maziar Yazdani    

Resumen

To successfully complete a project, selecting the most appropriate construction method and configuration is critical. There are, however, plenty of challenges associated with these complex decision-making processes. Clients require projects with the desired cost, time, and quality, so contractors should trade-off project goals through project configuration. To address this problem, in this study, an integrated FTA-DFMEA approach is proposed that implements the integrated AHP-TOPSIS method to improve construction project configuration. The proposed approach applies quality management techniques and MADM methods concurrently for the first time to improve construction project configuration considering project risks, costs and quality. At first, the Client?s requirements and market feedback are considered to identify potential failures in fulfilling project goals, and an integrated AHP-TOPSIS is used to select the most critical potential failure. Then fault tree analysis is used to indicate minimal paths. An inverse search in the operational model is performed to determine relevant tasks and identify defective project tasks based on WBS. Afterward, failure modes and effect analysis are applied to identify failure modes, and an integrated AHP-TOPSIS is used to rank failure modes and select the most critical one. Then Corrective actions are carried out for failure modes based on their priority, and project configuration is improved. This study considers construction resource suppliers with different policies, delivery lead times, warranty costs, and purchasing costs. Moreover, redundancy allocation and different configuration systems such as series and parallel are taken into account based on the arrangement and precedence of tasks. Finally, a case study of a building construction project is presented to test the viability of the proposed approach. The results indicate that the proposed approach is applicable as a time-efficient and powerful tool in the improvement of construction project configuration, which provides the optimal output by considering various criteria with respect to the client?s requirements and contractor?s obligations. Moreover, the algorithm provides various options for the contractor to improve the implementation of construction projects and better respond to challenges when fulfilling project goals.

 Artículos similares

       
 
Wisal Khan, Teerath Kumar, Cheng Zhang, Kislay Raj, Arunabha M. Roy and Bin Luo    
The competent software architecture plays a crucial role in the difficult task of big data processing for SQL and NoSQL databases. SQL databases were created to organize data and allow for horizontal expansion. NoSQL databases, on the other hand, support... ver más

 
Truong Duc Toan and Bui Anh Tu    
Water is an important input for irrigated agriculture. However, the irrigation sector, especially in developing countries, often faces pressure to secure water for production activities and maintain irrigation services. To sustain the supply and delivery... ver más
Revista: Water

 
Cristina E. Almeida-Naranjo, Víctor H. Guerrero and Cristina Alejandra Villamar-Ayala    
Emerging contaminants (ECs) are causing negative effects on the environment and even on people, so their removal has become a priority worldwide. Adsorption and the associated technologies where this process occurs (filtration/biofiltration) have gained ... ver más
Revista: Water

 
Meenakshi Arora, Ishitha Chopra, Minh Hoang Nguyen, Priyaga Fernando, Matthew J. Burns and Timothy D. Fletcher    
Permeable pavement (PP) systems have been shown to provide onsite stormwater management as well as contaminant removal benefits. Therefore, significant research has taken place in recent years to analyse the performance of these structures in terms of th... ver más
Revista: Water

 
Mugdha P. Kshirsagar and Kanchan C. Khare    
The present study is an attempt to model the stormwater quality of a stream located in Pune, India. The city is split up into twenty-three basins (named A to W) by the Pune Municipal Corporation. The selected stream lies in the haphazardly expanded peri-... ver más
Revista: Hydrology