Inicio  /  Buildings  /  Vol: 12 Par: 9 (2022)  /  Artículo
ARTÍCULO
TITULO

BIM-Based Resource Tradeoff in Project Scheduling Using Fire Hawk Optimizer (FHO)

Milad Baghalzadeh Shishehgarkhaneh    
Mahdi Azizi    
Mahla Basiri and Robert C. Moehler    

Resumen

Project managers should balance a variety of resource elements in building projects while taking into account many major concerns, including time, cost, quality, risk, and the environment. This study presents a framework for resource trade-offs in project scheduling based on the Building Information Modeling (BIM) methodology and metaheuristic algorithms. First, a new metaheuristic algorithm called Fire Hawk Optimizer (FHO) is used. Using project management software and the BIM process, a 3D model of the construction is created. In order to maximize quality while minimizing time, cost, risk, and CO2 in the project under consideration, an optimization problem is created, and the FHO?s capability for solving it is assessed. The results show that the FHO algorithm is capable of producing competitive and exceptional outcomes when it comes to the trade-off of various resource options in projects.

 Artículos similares

       
 
Yifeng Yang, Jingshuai Luan, Jing Nie, Xin Zhang, Jiong Du, Gang Zhao, Lei Dong, Yong Fan, He Cui and Yubo Li    
In the past, due to improper sludge treatment technology and the absence of treatment standards, some municipal sludge was simply dewatered and then sent to landfills, occupying a significant amount of land and posing a serious threat of secondary pollut... ver más
Revista: Water

 
Mehran Vahedi Nikbakht, Mohammad Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, Reza Moezzi and Amir Vadiee    
Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) a... ver más
Revista: Infrastructures

 
Lelin Lv, Canjun Chen and Zhuofu Wang    
The tendency of infrastructure projects to be complex, large-scale, and long-term prompts temporary project organizations? need to have resilience to deal with various risks, uncertainties, and crises. The resource and cognitive capacity of stakeholders ... ver más
Revista: Buildings

 
Ming Zhang, Lijun Fan, Yongmin Liu, Sixiang Zhang and Dalin Zeng    
Project sustainability has become a research hotspot in the construction industry and a crucial driving force for the successful delivery of projects. How enterprises can improve project sustainability performance and realize sustainable development by a... ver más
Revista: Buildings

 
Xiaohong Yin, Jun Song and Qiang Liu    
The carbon-neutral behavior of building construction companies is a key issue in carbon-neutral research worldwide. However, little is known about the willingness of construction firms to segregate and recycle construction waste. After studying a large a... ver más
Revista: Buildings