ARTÍCULO
TITULO

Analisis Keterlambatan Proyek Konstruksi di PT. PLN (Persero) UIP Sumbagut

Irwan Irwan    
Melloukey Ardan    
Nuril Mahda Rangkuti    
Febrina Monalisa    

Resumen

Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were grouped into 6 categories. The research is done by distributing questionnaires to 20 respondents from the owner who also handles the project. The data analysis used a comparison of the percentage, rank mean and standard deviation which were analyzed with Statistical Product and Service Solutions (SPSS). Based on the results of data analysis, it was found that the main factor causing delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut is a shortage of manpower to complete a project. In addition, there are several other dominant factors, namely labor qualifications that do not meet standards; difficulties in financial cash flow and project funding from contractors; scheduling conflicts with sub-contractors and suppliers in the completion of work; security disturbances during the project.

Palabras claves

 Artículos similares

       
 
Peter Uchenna Okoye, Kevin Chuks Okolie, Isaac Abiodun Odesola    
This study assessed the risks level associated with implementation of sustainable construction practices through a questionnaire survey distributed to 256 building professionals in Nigeria. It identified 47 risk factors with different likelihood of occur... ver más

 
Rohana Sham, Ching Sin Siau, Steven Tan, Dawn Chii Kiu, Hasminulhadi Sabhi, Hui Zhu Thew, Ganeshsree Selvachandran, Shio Gai Quek, Noorsiah Ahmad and Mohd Hanif Mohd Ramli    
Rural areas are often difficult to access reliably with medicine and vaccines. This study aimed to examine rural health care workers? attitude towards drone delivery for medicine and vaccines and the factors that influenced it. Health care workers from f... ver más
Revista: Drones

 
Bilal Manzoor, Idris Othman, Syed Shujaa Safdar Gardezi and Ehsan Harirchian    
In terms of sustainable growth, Malaysia?s construction industry faces significant challenges, such as construction costs and lack of awareness. To meet these challenges, it is essential to integrate building information modeling (BIM) and sustainable de... ver más
Revista: Buildings

 
Jhe-Syuan Lai, Yu-Chi Peng, Min-Jhen Chang and Jun-Yi Huang    
The present researchers took multistation-based panoramic images and imported the processed images into a virtual tour platform to create webpages and a virtual reality environment. The integrated multimedia platform aims to assist students in a surveyin... ver más

 
Malgorzata Kedzior-Laskowska     Pág. 51 - 62
The article presents the results of research regarding the impact of technical and technological innovations on the quality of services in road transport of goods. The study was conducted using a structured questionnaire survey on a sample of 134 road tr... ver más