ARTÍCULO
TITULO

Risk analysis and high speed rail projects in France: introducing economic slowdown into appraisal methodologies

Thibaut Limon    
Yves Crozet    

Resumen

In France the high speed rail (HSR) network has been regularly extended (More than 2000km in 2015). But France is now facing at once a structural economic slowdown and a growing scarcity of public funds. What are the impacts of this ?new deal? on HSR projects appraisals? How to introduce these systemic risks in CBA? How the public decision maker can take into account the risk? Can we guess that the state, investing in a large number of different projects, has indeed a complementary portfolio and therefore not risky? The paper makes a distinction between non-systemic risks (when the risk of the project is not correlated with macroeconomic trends) and systemic risks (related to macroeconomic variables like GDP). These systemic risks are exactly the kind of risks that HSR projects have to face because of the economic slowdown. In the new methodology proposed in France by the new guideline (2014), different options are proposed to introduce the macroeconomic risks, especially the likelihood of a long period of very weak economic growth. Considering the systemic risks, and following one of these options, we introduce in CBA a QUOTE ß parameter, defined by taking into account the macroeconomic risk. The result is a change in the discount rate. A first stimulating result has been obtained by computing not the IRR, that is to say the rate of discount leading the NPV to a value of zero, but the rate of economic growth of GDP (between 2016 and 2024) cancelling the NPV of a given project (South West HSR project). A second stimulating result lies in the comparison of NPV and IRR according to different values of the rate of discount. Taking into account the risk in the new methodology leads to increase the rate of discount and therefore to reduce the NPV of the project, even if the IRR is higher in relation with the fact that the new methodology with risk is including a longer period of operating (70 years instead of 50).

 Artículos similares

       
 
Francesco Caridi, Antonio Francesco Mottese, Giuseppe Paladini, Santina Marguccio, Maurizio D?Agostino, Alberto Belvedere, Domenico Majolino and Valentina Venuti    
In this article, an investigation into the natural radioactivity content in natural inorganic pigments was carried out, together with the assessment of the radiological health risk for the public related to external exposure to ionizing radiations, via H... ver más
Revista: Applied Sciences

 
Kaiwen Song, Xiujuan Jiang, Tianye Wang, Dengming Yan, Hongshi Xu and Zening Wu    
The uneven spatial and temporal distribution of water resources has consistently been one of the most significant limiting factors for social development in many regions. Furthermore, with the intensification of climate change, this inequality is progres... ver más
Revista: Water

 
?tefan Bila?co and Titus-Cristian Man    
On a global scale, traffic incidents are a leading cause of mortality and material damage. Romania exhibits the highest rate of road traffic fatalities both in the European Union and worldwide, requiring a comprehensive examination of its overall influen... ver más
Revista: Applied Sciences

 
Zhi Shan, Yuling Liang, Zhiwu Yu and Huihua Chen    
China has emerged as a prominent global player in the field of railways, with numerous railway construction projects spanning across diverse locations. Railway bridges, as a crucial component of railway construction, warrant significant attention. Meta-a... ver más
Revista: Applied Sciences

 
Min Wang, Xiaoyu Song, Yu Han, Guantao Ding, Ruilin Zhang, Shanming Wei, Shuai Gao and Yuxiang Liu    
In order to understand the pollution degree and source of potentially toxic elements (PTEs) in groundwater around the accident site and evaluate their harm to human health, 22 groundwater samples were collected around the accident well, and the contents ... ver más
Revista: Water