Inicio  /  Buildings  /  Vol: 8 Núm: 1 Par: January (2018)  /  Artículo
ARTÍCULO
TITULO

Critical Delaying Factors: Public Sector Building Projects in Gilgit-Baltistan, Pakistan

Shahid Hussain    
Fangwei Zhu    
Zaigham Ali    
Hassan Danial Aslam and Abasal Hussain    

Resumen

Project delays are a large and prevalent problem in the Gilgit-Baltistan construction industry, and delays can distinctly affect project duration, budget, and also community needs. The purpose of this study is to highlight and rank delaying factors in the Annual Development Programme public sector building infrastructure projects and examine them through a relative importance index. A total of 52 delaying factors were identified through a detailed literature review and categorized into eight major groups, and a pilot study with 16 experienced construction experts was conducted. A questionnaire survey was conducted to collect the importance of each factor from public construction experts. In total, 102 respondents participated in the survey. The study determined that difficulties in financing projects by contractors, delays in progress payments, dispute on land usage, improper project feasibility studies, award project to the lowest bid price, extreme weather conditions, inadequate contractor experience, and insufficient data collection and survey before design were among the top eight critical delaying factors. In addition, Spearman?s rank correlation tests revealed that there was no difference in perception between owners and contractors. A comparison of the top five delay factors was done with eight preferred construction industries in Asia to validate the results of this study. The findings are likely to be a solid contribution to the Gilgit-Baltistan construction industry in mitigating future construction delays.

 Artículos similares

       
 
Wei Wang, Huanhuan Feng, Yanzong Li, Quanwei You and Xu Zhou    
At present, the determination of tunnel parameters mainly rely on engineering experience and human judgment, which leads to the subjective decision of parameters and an increased construction risk. Machine learning algorithms could provide an objective t... ver más
Revista: Buildings

 
Marianna Kalogeraki and Fani Antoniou    
In the Architecture, Engineering and Construction (AEC) industry claims arise frequently, often resulting in disputes. Claim management should be efficient to prevent claims from escalating into disputes, and if disputes are still unavoidable, they shoul... ver más
Revista: Buildings

 
Brian G. Roche, Michael A. Perez, Wesley N. Donald and Jarrell Blake Whitman    
Sediment barriers are used on construction sites to protect downstream waterbodies from the impacts of sediment-laden stormwater runoff. Although ubiquitous on construction sites, many sediment barrier practices lack performance-based testing to determin... ver más
Revista: Water

 
Xiaokai Li, Xiaolong Zhang, Faming Zhang, Jian Huang, Shixiong Tang and Zhiqing Liu    
The mountainous areas of Southwest China have the characteristics of valley deep-cutting, a large topographic gradient, complex geological structures, etc. With the development of infrastructure construction in the area, the construction of bridges acros... ver más
Revista: Water

 
Mei-Yung Leung, Khursheed Ahmed and Isabella Y. S. Chan    
Engineers often play vital roles in technical planning, designing, and operating projects, as well as implementing standard requirements in the physical sites. Although architectural designs may be similar in a construction project, the technical problem... ver más
Revista: Buildings