Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland

Wajiha Shahzad    
Jasper Mbachu and Niluka Domingo    

Resumen

Several studies have documented benefits of prefabrication system (prefab) compared to the traditional building system (TBS). However, the documented benefits have been anecdotal or fragmented with reports of isolated case study projects. Few studies have looked at the objectively quantified benefits from statistical significance point of view and across building types in New Zealand. This study contributes to filling this knowledge gap by analyzing cost and time-savings, and productivity improvement achievable by the use of prefab in place of the TBS. Records of completion times and final contract values of 66 building projects implemented using prefab in Auckland were collected. The building types included commercial, houses, apartments, educational, and community buildings. The project details included final contract sums, completion dates, gross floor areas, and number of floors. Based on these details, the equivalent completion times and the final cost estimates for similar buildings implemented using the TBS were obtained from the Rawlinsons construction data handbook and feedback from some designers and contractors. Marginal productivity outcome for each building project was computed as the product of the cost and time-savings achieved using the prefab. Results showed that the use of prefab in place of TBS resulted in 34% and 19% average reductions in the completion times and costs, respectively. This also translated to overall 7% average improvement in the productivity outcomes in the building projects. Univariate ANOVA-based hypothesis test results showed that ?building type? had no significant effects on the cost and productivity improvement outcomes, but had significant effect on the time savings analyzed in the case study projects. The greatest productivity gain of 11% was achieved in house projects. These evidence-based results could guide optimized use of prefab for specific building application. The hypothesis-testing outcome provides insights on one of several potential influences on prefab improvements, which will be analyzed in subsequent research.

 Artículos similares

       
 
J. J. McArthur, Chris Jofeh and Ann-Marie Aguilar    
There is increasing literature demonstrating the link between building indoor environmental quality, and occupant health and productivity, driving the corporate real estate industry to investigate how to integrate wellness features in both new and existi... ver más
Revista: Buildings

 
Sonia Quiroga, Zaira Fernández-Haddad and Cristina Suárez    
The coming agenda for the European Common Agricultural Policy includes more incentives for the environmental compliance of farmer?s activities. This will be particularly important in the case of water risk management in Mediterranean countries. Among the... ver más
Revista: Water

 
Karthikeyan Chandrasekaran, Sureshkumar Devarajulu and Palanisami Kuppannan    
The economic value of tank irrigation water was determined through Contingency Valuation Method by analyzing farmers? willingness to pay for irrigation water under improved water supply conditions during wet and dry seasons of paddy cultivation. Quadrati... ver más
Revista: Water