Redirigiendo al acceso original de articulo en 23 segundos...
Inicio  /  Buildings  /  Vol: 13 Par: 4 (2023)  /  Artículo
ARTÍCULO
TITULO

Risk Identification of Building Construction Projects in Egypt

Elhosin Yousri    
Ahmed El Badawy Sayed    
Moataz A. M. Farag and Ahmed Mohammed Abdelalim    

Resumen

Risk identification is integral to construction management. The severe consequences of identified risk factors on time and cost performance can be addressed by improved risk management. The identification and preparation of responses to risk factors affects the risk management process directly and indirectly. Recent changes in the valuation of the Egyptian currency against foreign currencies during the last year and measures to cut down on the importation of engineering materials and equipment have had significant effects on the existing and recognized regulations concerning construction in Egypt. A pilot survey with expert engineers is a crucial step in completing research. In this research study, 15 experts were asked to discuss the collected risk factors from previous studies to verify the workability of these factors in Egypt. Thirty-five risk factors were selected during the pilot survey, which was distributed to 95 participants. To facilitate the analysis process, the collection was based on a five-point Likert scale. Therefore, redefining and arranging the risks according to the current circumstances is the main objective of this study. The proposed model identified different high-risk factors that could cumulatively affect overall performance, such as funding problems from contractors, material price fluctuations, unrealistic estimates of the duration of project activities, and shortages of construction materials in the market. Thus, to help stakeholders achieve project success, these high-risk factor components should be identified and controlled duly.

 Artículos similares

       
 
Shalaka Hire, Sayali Sandbhor and Kirti Ruikar    
With developments in Industry 4.0, there is growing momentum to adopt technology-assisted tools to support existing processes. Even though most construction processes are now computerized, safety procedures have not yet fully embraced the digital revolut... ver más
Revista: Buildings

 
Matteo Dellacasagrande, Davide Lengani, Daniele Simoni and Marina Ubaldi    
The bursting phenomenon consists in the switch of a laminar separation bubble from a short to a long configuration. In the former case, reduced effects on profile pressure distribution are typically observed with respect to the attached condition. On the... ver más

 
Meng Li, Jiqiang Liu and Yeping Yang    
Data governance is an extremely important protection and management measure throughout the entire life cycle of data. However, there are still data governance issues, such as data security risks, data privacy breaches, and difficulties in data management... ver más
Revista: Future Internet

 
Min Wang, Wenxiu Zhang, Peng Yang, Jianguo Feng, Ruilin Zhang, Zongjun Gao, Hongjie Jin, Xiaoyu Song and Xiaobing Gao    
Groundwater shortage and pollution are critical issues of global concern. In Wulian County, a typical hilly area, groundwater is the main source of water supply. This study investigates the current situation of groundwater pollution in Wulian City throug... ver más
Revista: Water

 
Susana Román-Pérez, Raúl Aguirre-Gómez, Juan Eugenio Hernández-Ávila, Luisa Basilia Íñiguez-Rojas, René Santos-Luna and Fabián Correa-Morales    
Dengue is a public health problem in more than 100 countries around the world and in virtually the entire region of the Americas, including Mexico. Mosquitoes of the genus Aedes aegypti transmit dengue; its reproduction requires certain geographical, epi... ver más