Power Plant Construction Projects Risk Assessment: A Proposed Method for Temporary Systems of Commissioning

José Ignacio Sánchez Colmenarejo    
Felipe Morales Camprubí    
Cristina González-Gaya and Alberto Sánchez-Lite    

Resumen

The identification of hazards and risk assessment are key factors in the safety of the industries, including power plants. This paper contains an original risk analysis method that increases the level of safety in commissioning and start-up operations. With the proposed method, which has been tested in real industrial facilities, it has been possible to increase the safety of the system and reduce the likelihood of incidents and accidents in one of the most dangerous stages of project construction activities. This paper also gives an overview of the processes and procedures used in the construction of power plants compared to other industry sectors, proposing some areas for potential improvement. It has been verified that temporary systems used during commissioning apply risk evaluation techniques that do not consider some aspects related to process hazards, something that can be important for the prevention of accidents that historically happen at this stage. Analysis of the data has determined that, in these stages, there have been incidents and accidents, some of them severe. Thus, in this paper, a methodology is proposed. The method allows addressing the particularities of the execution of temporary systems in a safe way by putting into practice an agile and flexible method that can be applied to these particular systems, so that the risk levels can be reduced. The method was applied to one real application representative of this kind of system and yielded excellent results. The proposed methodology is highly recommended as an improvement for the power industry.

 Artículos similares

       
 
Ibrahim Tursunovic and Davide Papurello    
The energy sector is the main source of greenhouse gases, so it has the highest potential for improvement. The improvements can be achieved by generating energy from renewable sources. It is necessary to combine production from renewable sources with sto... ver más

 
Qiang Pei, Pengfei Qi, Zhicheng Xue, Jintu Zhong and Yao Zhang    
The aim of this study was to further research the mechanical properties of epoxy thick-layer rubber isolation bearings, adopting orthogonal design and efficacy coefficient methods in order to optimize the geometric dimensions and material parameters of t... ver más
Revista: Buildings

 
Zhiping Gao, Wenwen Kang, Xinghua Chen, Sheng Ding, Wei Xu, Degang He, Wenhu Chen and Da Xu    
Advancements of the virtual power plant (VPP) concept have aggregated buildings as their power plants and/or service providers. This paper proposes a peer-to-peer transactive computation?electricity trading framework for multiple-building virtual power p... ver más
Revista: Buildings

 
Yang Hu, Wen Bai, Junwu Dai and Qingwen Li    
Thermal power plants play a crucial role in the power system as critical lifeline infrastructure. In order to meet the production process requirements, the main building of a thermal power plant is often connected to a coal conveyor trestle. This study f... ver más
Revista: Buildings

 
Noah Yakah, Mahrokh Samavati, Augustine Akuoko Kwarteng, Andrew Martin and Anthony Simons    
The per capita municipal solid waste (MSW) generation per day in Ghana is estimated to be 0.47 kg/person/day, which translates to over 14,000 tonnes of solid waste generation daily. The disposal and management of this amount of solid waste has been chall... ver más