Redirigiendo al acceso original de articulo en 20 segundos...
Inicio  /  Applied Sciences  /  Vol: 13 Par: 5 (2023)  /  Artículo
ARTÍCULO
TITULO

Performance Appraisal of Urban Street-Lighting System: Drivers? Opinion-Based Fuzzy Synthetic Evaluation

Fawaz Alharbi    
Meshal I. Almoshaogeh    
Anwar H. Ibrahim    
Husnain Haider    
Abd Elaziz M. Elmadina and Ibrahim Alfallaj    

Resumen

Saudi Arabian urban roads and highways have witnessed a large number of traffic crashes. Road lighting is one of the most important factors influencing drivers? safety during the nighttime. Street-lighting design (e.g., spacing and height), visibility (e.g., lane marking and oncoming vehicles), and drivers? satisfaction (e.g., glare effect on eyes and overall ambiance) are primary criteria affecting the performance of an urban street-lighting system (USLS). The present study presents a methodology for the performance appraisal of USLS in Qassim, Saudi Arabia. An online questionnaire survey was developed to obtain drivers? opinions on nine sub-criteria (three under each primary criterion). The responses were translated into a five-scale subjective rating system from very low to very high. Fuzzy synthetic evaluation (FSE) effectively aggregated the statistically diverse (p-value < 0.001) responses obtained on the three primary criteria. The study found that electronic billboards? positioning, oncoming vehicle lights, and poor lighting in the course of bad weather (mainly dust) are mainly affecting the performance of USLS in the view of road users. The performance levels ranged between ?medium? and ?high?, with no criteria or sub-criteria achieving a ?very high? level, suggesting a need for upgrades, such as conversion to LED lights and smart lighting control systems. The proposed methodology benefits the transportation ministries to identify lacking components of USLSs in different regions of Saudi Arabia. The methodology provides the opportunity to include additional or site-specific factors for appraising the performance of USLS before (during planning and design) or after the implementation of improvement actions.

 Artículos similares

       
 
Xavier Bellsolà Olba, Winnie Daamen, Tiedo Vellinga and Serge P. Hoogendoorn    
Ports represent a key element in the maritime transportation chain. Larger vessels and higher traffic volumes in ports might result in higher risks at the navigational level. Thus, the dire need for a comprehensive and efficient risk assessment method fo... ver más

 
Muhammad Atiq Ur Rehman Tariq, Rashid Farooq and Nick van de Giesen    
All over the world, probability-based flood protection designs are the ones most commonly used. Different return-period design floods are standard criteria for designing structural measures. Recently, risk-based flood management has received a significan... ver más
Revista: Applied Sciences

 
Wahyudi Agustiono     Pág. 1 - 12
Background: For many years, researches on Business Intelligence (BI) development have been popular in primary industry (trading, telecommunication, and manufacturing). Nevertheless, the academic sector has not been the primary beneficiary. This lack of p... ver más

 
Mohammed Al Mohsin, Bevian Al Hadithi, Ali Alnuaimi     Pág. 96 - 102
Construction industry comprises a high degree of competition; the performance of construction projects is highly affected by the performance of civil engineers who arethe core of construction productivity. Professional development is one of the essential... ver más

 
Maryam Al Fazari, Dr. M. Firdouse Rahman Khan    
Purpose The objective of the study is to investigate whether the performance appraisal system used is in Majan Electricity Company, (Oman), measures the employees? performance accurately and to ensure motivation and satisfaction of its employees.Design/m... ver más