Redirigiendo al acceso original de articulo en 24 segundos...
Inicio  /  Applied Sciences  /  Vol: 10 Par: 6 (2020)  /  Artículo
ARTÍCULO
TITULO

The S-Curve as a Tool for Planning and Controlling of Construction Process?Case Study

Jaroslaw Konior and Mariusz Szóstak    

Resumen

One of the key tasks of an investor and a contractor at the stage of planning and implementing construction works is to measure the progress of execution with regard to the planned deadlines and costs. During the execution of construction works, the actual progress of the works may differ significantly from the initial plan, and it is unlikely that the construction project will be implemented entirely according to the planned work and expenditure schedule. In order to monitor the process of deviations of the deadline and the budget of the investment task, several rudimentary methods of planning?as well as the cyclical control of the progress of construction projects?are used. An effective tool for measuring the utilization of the financial outlays of a construction project is the presentation of the planned financial flows on a timeline using a cumulative cost chart, the representation of which is the S-curve. The purpose of this paper is to analyze the course of an sample construction project comparing the planned costs of the scheduled works with the actual costs of the performed works, as well as identifying the reasons leading to the failure to meet the planned deadlines and budget of the project implementation. As part of the research conducted at a construction site of a hotel facility, the authors of this paper analyzed each of the 20-month effects of financial expenditures on construction works that were developed and processed by the Bank Investment Supervision (BIS) over a period of three years (between 2017 and 2019). Based on these results, charts and tables of the scheduled and actual cumulative costs of the completed construction project were prepared, the careful analysis of which enables interesting conclusions to be drawn.

 Artículos similares

       
 
Hongwei Liu and Bo Han    
Xiong?an New Area is a national event and a project planned for a millennium of China. Its high-quality construction is of great significance to easing the noncapital functions of Beijing and the coordinated development of the Beijing-Tianjin-Hebei regio... ver más
Revista: Applied Sciences

 
Luka Crnogorac, Suzana Lutovac, Rade Tokalic, Milo? Gligoric and Zoran Gligoric    
Relatively large deformations of the steel arch support in underground coal mines in the Republic of Serbia present one of the main problems for achieving the planned production of coal. Monitoring of the critical sections of the steel arch support in th... ver más
Revista: Applied Sciences

 
DingXin Cheng and Lerose Lane    
Single chip seals are used by many agencies to maintain or preserve their roadways. While the construction and performance of single chip seals can be easily found from literature, the construction of double chip seals with and without paving fabric or p... ver más
Revista: Infrastructures

 
Zhi Li, Haoyu Mao, Biao Li, Xiang Zhou, Guo Liao and Jianjun Chen    
Numerous large hydropower projects have been built, are being built, or are planned to be developed in southwest China as a result of the increasing demand for clean energy in China?s social and economic development. Based on engineering geological data,... ver más
Revista: Applied Sciences

 
Xinyu Li, Dingli Zhang and Yanjuan Hou    
With the increasing intensity of underground development, the planned metro lines will inevitably pass through water-rich soft stratum. The existing research results show that shield tunneling in water-rich stratum is prone to ground settlement and segme... ver más
Revista: Applied Sciences