Redirigiendo al acceso original de articulo en 18 segundos...
ARTÍCULO
TITULO

A Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization

Yongsheng Yang    
Shu Sun    
Meisu Zhong    
Junkai Feng    
Furong Wen and Haitao Song    

Resumen

A U-shaped automated container terminal (ACT) has been proposed for the first time globally and has been adopted to construct the Beibu Gulf Port ACT. In this ACT layout, the double cantilevered rail crane (DCRC) simultaneously provides loading and unloading services for the external container trucks (ECTs) and the automatic guided vehicles (AGVs) entering the yard. The DCRC has a complex scheduling coupling relationship with the AGV and the ECT, and its mathematical model is extremely complex. There is an urgent need to study a practical collaborative scheduling optimization model and algorithm for the DCRC, the AGV, and the ECT. In this paper, we optimize the process flow of DCRCs to study the refined collaborative scheduling model of DCRCs, AGVs and ECTs in U-shaped ACTs. Firstly, we analyze the operation process of the DCRC and divide the 16 loading and unloading conditions of the DCRC into four operation modes for process optimization. Secondly, different variables and parameters are set for the DCRC?s four operating modes, and a refined collaborative dispatching model for the DCRCs with AGVs and ECTs is proposed. Finally, a practical adaptive co-evolutionary genetic algorithm solves the model. Meanwhile, arithmetic examples verify the correctness and practicality of the model and algorithm. The experimental results show that the total running time of the DCRCs is the shortest in the U-shaped ACT when the number of quay cranes (QC) to DCRC and AGV ratios are 1:2 and 1:10, respectively. At the same time, the number of QCs and DCRCs has a more significant impact on the efficiency of the ACT than that of AGVs, and priority should be given to the allocation of QCs and DCRCs. The research results have essential guidance value for U-shaped ACTs under construction and enrich the theory and method of collaborative scheduling of U-shaped ACT equipment.

 Artículos similares

       
 
Junkang Qin, Xiao Wang, Dechang Mi, Qinmu Wu, Zhiqin He and Yu Tang    
The study of human torso medical image segmentation is significant for computer-aided diagnosis of human examination, disease tracking, and disease prevention and treatment. In this paper, two application tasks are designed for torso medical images: the ... ver más
Revista: Applied Sciences

 
Junjun Li, Lixing Yan and Bowei Xu    
A new layout of the U-shaped automated terminal is more convenient to connect between the terminal and the railway. In this study, a sort of cluster scheduling method for multiple equipment between a U-shaped automated terminal yard and a railway yard is... ver más

 
Bowei Xu, Depei Jie, Junjun Li, Yunfeng Zhou, Hailing Wang and Huiyao Fan    
Automated guided vehicles (AGVs) in the U-shaped automated container terminal travel longer and more complex paths. The conflicts among AGVs are trickier. The scheduling strategy of the traditional automated container terminal is difficult to be applied ... ver más

 
Jiawu Li, Jun Wang, Xue Zhao, Feng Wang and Yu Li    
The wind parameter distribution law at a bridge midspan in a U-shaped valley has important influence on the wind strength of this bridges. In this paper, the wind characteristics were researched by computational fluid dynamics (CFD). The surface roughnes... ver más
Revista: Applied Sciences

 
Hongbo Shi, Xikun Wang, Qingjiang Xiang, Gonghe Zhang and Lin Xue    
In the marine fire suppression system, continuous delivery of dry chemical powder to the fire source with long powder discharge range and high dispersion concentration is essential. The work is devoted to experimental and numerical studies of the flow ch... ver más