Duration and Labor Resource Optimization for Construction Projects?A Conditional-Value-at-Risk-Based Analysis

Fan Ding    
Min Liu    
Simon M. Hsiang    
Peng Hu    
Yuxiang Zhang and Kewang Jiang    

Resumen

The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework based on Value at Risk (VaR) and Conditional Value at Risk (CVaR) approaches to explore and predict a project schedule and cost performance under different scenarios. This research selected a high-rise residential building project for a case study and collected 1672 productivity data samples. Arena Simulation models were established based on 90 combinations of labor assignments to assess Takt-time planning strategies? impact on project performance in four scenarios. The VaR and CVaR evaluations at 75% and 90% confidence levels were compared to balance project benefits and risks. Without any overtime or additional workers, this research found a Takt-time planning method that can reduce the project duration by 20.2% and labor costs by 2.1% at the same time, using a labor assignment of 12 bar placers, 12 carpenters, and 5 pipefitters. The findings can assist construction managers to achieve a shorter duration, reduced cost, and safer work environment, which will be very effective and beneficial to improve project overall performance.

 Artículos similares

       
 
Cong Liu, Hui Zeng and Jiming Cao    
Prefabricated construction (PC) is considered to be a low-carbon construction method. Implementing prefabricated construction projects (PCPs) requires multiple industry organizations to participate and collaborate. As different PCPs are initiated and imp... ver más
Revista: Buildings

 
Razieh Karimi, Milad Baghalzadeh Shishehgarkhaneh, Robert C. Moehler and Yihai Fang    
This systematic literature review examines the effects of social media use (SMU) and practices (SMPs) on team feedback (TF) and performance (TP) within the context of construction project management. It explores the complex interactions between SMU and S... ver más
Revista: Buildings

 
Sadaf Montazeri, Zhen Lei and Nicole Odo    
The construction industry, despite its anticipated significant growth, has struggled with low productivity over the past two decades. Design for manufacturing and assembly (DfMA), a methodology with a history of success in other industries, presents a pr... ver más
Revista: Buildings

 
Mehran Vahedi Nikbakht, Mohammad Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, Reza Moezzi and Amir Vadiee    
Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) a... ver más
Revista: Infrastructures

 
Mei-Yung Leung, Khursheed Ahmed and Isabella Y. S. Chan    
Engineers often play vital roles in technical planning, designing, and operating projects, as well as implementing standard requirements in the physical sites. Although architectural designs may be similar in a construction project, the technical problem... ver más
Revista: Buildings