Analysis on improving operational efficiency of construction project site
Main Article Content
صندلی اداریAbstract
Downloads
Article Details
1. Proposal of Policy for Free Access Periodics
Authors whom publish in this magazine should agree to the following terms:
a. Authors should keep the copyrights and grant to the magazine the right of the first publication, with the work simultaneously permitted under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 that allows the sharing of the work with recognition of the authorship of the work and initial publication in this magazine.
b. Authors should have authorization for assuming additional contracts separately, for non-exclusive distribution of the version of the work published in this magazine (e.g.: to publish in an institutional repository or as book chapter), with recognition of authorship and initial publication in this magazine.
c. Authors should have permission and should be stimulated to publish and to distribute its work online (e.g.: in institutional repositories or its personal page) to any point before or during the publishing process, since this can generate productive alterations, as well as increasing the impact and the citation of the published work (See The Effect of Free Access).
Proposal of Policy for Periodic that offer Postponed Free Access
Authors whom publish in this magazine should agree to the following terms:
a. Authors should keep the copyrights and grant to the magazine the right of the first publication, with the work simultaneously permitted under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 [SPECIFY TIME HERE] after the publication, allowing the sharing of the work with recognition of the authorship of the work and initial publication in this magazine.
b. Authors should have authorization for assuming additional contracts separately, for non-exclusive distribution of the version of the work published in this magazine (e.g.: to publish in institutional repository or as book chapter), with recognition of authorship and initial publication in this magazine.
c. Authors should have permission and should be stimulated to publish and to distribute its work online (e.g.: in institutional repositories or its personal page) to any point before or during the publishing process, since this can generate productive alterations, as well as increasing the impact and the citation of the published work (See The Effect of Free Access).
d. They allow some kind of open dissemination. Authors can disseminate their articles in open access, but with specific conditions imposed by the editor that are related to:
Version of the article that can be deposited in the repository:
Pre-print: before being reviewed by pairs.
Post-print: once reviewed by pairs, which can be:
The version of the author that has been accepted for publication.
The editor's version, that is, the article published in the magazine.
At which point the article can be made accessible in an open manner: before it is published in the magazine, immediately afterwards or if a period of seizure is required, which can range from six months to several years.
Where to leave open: on the author's personal web page, only departmental websites, the repository of the institution, the file of the research funding agency, among others.
References
ABDULAZIZ M. J.; RASHID A. B. (2009) Determinance of construction labor productivity. Operations Management Research, v. 86, n. 1 p.1582
BORDOLOI, M. P.; NATH, T. (2014) Modification of an Existing Layout of a Production Line Based on Distance Function. The International Journal of Science and Techno ledge, v. 2, n. 8, p. 78.
BURNS, P.; MERZ, S. K. (2012) Waste minimisation in the construction industry. International Journal of Emerging Technology and Advanced Engineering. P. 317-322.
CAI, H.; KANDIL, A.; HASTAK, M.; DUNSTON, P. S. (2012) Front Matter. In Construction Research Congress 2012: Construction Challenges in a Flat World, p. i-ixxx.
CHARY S. N. (2004) Types of layout Planning. Tata McGraw Hill Third Edition. N. 52
DENNIS, S. M. (2001) Construction site waste management and minimisation. International Council for Resarch and Innovation in Building and Construction. BP485-BOU/C36.
NESZMELYI, L.; Z. A. (2013) Vattai. Site-layout Design. Dynamic site layout planningthrough minimization of total potential energy, v. 31, n . 1 p. 92-102.
ELBELTAGI, E. (1983) Construction Site-layout Planning, Practical Site Management: An illustrated Guide, Second Edition. P. 227-231.
ELBELTAGI, E.; HEGAZY, T.; ELDOSOUKY, A. (2004) Dynamic layout of construction temporary facilities considering safety. Journal of construction engineering and management, v. 130, n. 4, p. 534-541.
ELGENDI, E. M. O.; AHMED, V.; AZIZ, Z. U. H.; SHAWKI, K. (2014) A dynamic automated system for site layout planning in Egypt. In: 14th International Conference on Construction Applications of Virtual Reality, University of Sharjah, p. 52-58.
EL-RAYES, K.; SAID, H. (2009) Dynamic site layout planning using approximate dynamic programming. Journal of Computing in Civil Engineering, v. 23, n. 2, p.119-127.
GOEL B. S. (2010) Production Operations Management. Himalaya Publishing House, Twenty Second Editon, v.19, n. 2, p. 22-28
GNANAVEL, S. S.; BALASUBRAMANIAN, V.; NARENDRAN, T. T. ( 2015) Suzhal–An alternative layout to improve productivity and worker well-being in labor demanded lean environment. Procedia Manufacturing, v. 3, p.574-580.
HANDIER, D. E. (1985) Productivity of construction professionals. Journal of Management in Engineering, v. 1, n. 1, p. 28-35.
JARKAS, A. M.; AL BALUSHI, R. A.; RAVEENDRANATH, P. K. (2015) Determinants of construction labour productivity in Oman. International Journal of Construction Management, v. 15, n. 4, p. 332-344.
KEYS, A.; BALDWIN, A. N.; AUSTIN, S. A. (2000) Designing to encourage waste minimization in the construction industry.
KUMAR, R. R.; SINGH, A. K. ( 2007) A CAD-based site layout for irregular facilities using ACO. In: 24th International Symposium l on Automation & Robotics in construction (ISARC 2007), IIT Madras, India. p. 383-388.
KUMAR, S.; BANSAL, V. K. (2016) A GIS-based methodology for safe site selection of a building in a hilly region. Frontiers of Architectural Research, v. 5, n. 1, p. 39-51.
PATIL, A. D.; JOSHI, D. A.(2013) A Review Paper on Construction Site Layout Planning. International Journal of Innovations in Engineering and Technology, v. 3, n. 2.
SHETTY, S. V.; DESHMUKH, A. R. (2015) A Review Paper on Identification of Crucial Site Layout Planning Factors in Construction. International Journal of Science and Research (IJSR), v. 4, n. 5, p. 126-128.
SANAD, H. M.; AMMAR, M. A.; IBRAHIM, M. E. (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, v. 134, n. 7, p. 536-544.
TOMMELEIN, I. D.; ZOUEIN, P. P. (1993) Interactive dynamic layout planning., Journal of construction engineering and management, v. 119, n. 2, p. 266-287.
WIEZEL, A.; OZTEMIR, A. E. (2003) The Influence of Design Methods on Construction Productivity. In: Construction Research Congress: Wind of Change: Integration and Innovation. p. 1-8.