Redirigiendo al acceso original de articulo en 16 segundos...
ARTÍCULO
TITULO

THEORETICAL AND METHODICAL TOOLKIT FOR MANAGING THE STAKEHOLDERS OF A PROJECT

Oleksandr Skachkov    
Irina Skachkov?    

Resumen

The subject matter is the processes of managing the stakeholders of a project.  The goal of the work is to develop a theoretical and methodological toolkit that will help rationalize the work with the stakeholders of a project. The objectives of the project are to improve the processes of managing the stakeholders of a project by analyzing the stakeholders of the project, creating a list of stakeholders, grouping stakeholders, identifying key stakeholders and building the reserve of project stakeholders. The methods used are the methods of strategic management in the project activity. The result of the study is modelling the process of managing the stakeholders of a project with the help of the Allfusion Process Modeller software, which will enable systematizing the information on the stakeholders of a project, forming the reserve of stakeholders and thereby reducing the risk of the project incompleteness. The first step of the model is the analysis of project documentation and the creation of a list of the stakeholders of a project. Further, with the help of the Mitchell model, the stakeholders of a project are grouped. Four key stakeholders are identified for the project, namely ? a customer, a project team, project performers, the future consumers of the project product. Contributions to the project are determined for each group of key stakeholders as well as incentives (benefits) that stakeholders receive from the project using the ASC model. Contributions and incentives are prioritized (by importance). Then the indicators for each contribution and incentive are determined and this information is recorded. The next step is to create a database of the stakeholders of a project, which enables systematizing information on the importance and the role of all stakeholders in the project. After dividing all the participants into three main categories, namely, the owner of the process or the manager, a key participant or a performer, an observer or important participant, they should be put in the project database. The given work presents the example of such a database organized in a table. The final step of the model for managing the stakeholders is building the reserve of the project stakeholders and updating project documentation. Conclusions. Improving the processes of managing the stakeholders of a project is of great importance in the current context as the impact of stakeholders on the project is growing every year and ignoring it will be a big mistake of the project manager.

 Artículos similares

       
 
Ning Zhang, Anye Cao, Weiwei Zhao, Qi Hao, Guowei Lv and Baixuan Wu    
There is a very thick water-bearing key strata above the coal seam in the Binchang mining area. When the mining scale is large, it easily breaks and leads to rockburst with a surge of water gushing in the panel. Adopting the layout pattern of a small pan... ver más
Revista: Applied Sciences

 
Jiawei Zhang, Dawei Xiao, Taotao Xie and Qing Ji    
A mathematical model for an electric field induced by an angularly oscillating magnetic dipole was proposed with magnetic vector potential to analyze the characteristics of the electric field induced by a rotating and angularly oscillating magnetic objec... ver más
Revista: Applied Sciences

 
R. Gayathri, Jen-Yi Chang, Chia-Cheng Tsai and Tai-Wen Hsu    
An oscillating water column (OWC) is designed for the extraction and conversion of wave energy into usable electrical power, rather than being a standalone renewable energy source. This review paper presents a comprehensive analysis of the mathematical m... ver más

 
Dominik Janetzko and Bacem Kacem    
In the domain of Advanced Air Mobility (AAM), Simplified Vehicle Operations (SVOs) promise a reduction in handling complexity and training time for pilots. Designing a usable human?machine interface (HMI) for pilots of SVO-enabled aircraft requires a dee... ver más
Revista: Aerospace

 
Saleh B. Alsaidi, Jeongmoo Huh and Mohamed Y. E. Selim    
The performance of two solid biomass wastes, date stone and jojoba solid waste, was experimentally examined for their potential application in combustion and propulsion systems. The fuels were tested in a hybrid rocket-like combustion environment, and th... ver más
Revista: Aerospace