ARTÍCULO
TITULO

Design Delays in Building Projects in India: Effects and Remedies

Dillip Kumar Das    
Fidelis Emuze    

Resumen

Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have been identified and policy interventions were compiled to reduce design linked delay. A survey method to collect data, statistical analysis and a Systems Dynamics modelling approach were used according to different scenarios to propose strategic interventions. The findings suggested that complexity of design and compilation of documents, and the combined complexity of both can cause substantial delay. The model results revealed that the combined effect of appointing competent consultants and communicating effectively could reduce delay significantly. The novelty of the study lies in using a systems approach to develop causal feedback relationships among variables, as opposed to considering one origin of the problem at a time. The study makes three contributions: (1) design-linked challenges and mechanisms of delay, based on causal feedback relationships in building construction, can be diagnosed to evolve appropriate remedial measures; (2) impacts of different interventions can be visualised quantitatively under different scenarios; and (3) an alternative methodology to examine the trend of the project period is offered.

 Artículos similares

       
 
John R Venable,Jan vom Brocke,Robert Winter    
Design Science Research (DSR) has many risks. Researchers inexperienced in DSR, especially early career researchers (ECRs) and research students (e.g. PhD students) risk inefficient projects (with delays, rework, etc.) at best and research project failur... ver más

 
Lei Meng, Xiaofeng Wang, Chunnian Zeng and Jie Luo    
The accurate air-fuel ratio (AFR) control is crucial for the exhaust emission reduction based on the three-way catalytic converter in the spark ignition (SI) engine. The difficulties in transient cylinder air mass flow measurement, the existing fuel mass... ver más
Revista: Energies

 
Shahid Hussain, Fangwei Zhu, Zaigham Ali, Hassan Danial Aslam and Abasal Hussain    
Project delays are a large and prevalent problem in the Gilgit-Baltistan construction industry, and delays can distinctly affect project duration, budget, and also community needs. The purpose of this study is to highlight and rank delaying factors in th... ver más
Revista: Buildings

 
Cristina Vilarinho, José Pedro Tavares, Rosaldo J.F. Rossetti     Pág. 325 - 334
This paper presents a person-based traffic signal control strategy for isolated intersection, including simultaneously signal plan design and signal timing optimization with real-time information on the network dynamics. In order to update the traffic si... ver más

 
Jamil Ghazi Sarhan, Bo Xia, Sabrina Fawzia, Azharul Karim     Pág. 46 - 69
The Kingdom of Saudi Arabia (KSA) has witnessed a huge increase in construction during the last two decades. However, many projects experienced time delays, cost overruns and the generation of massive amounts of waste. To address these challenges, lean c... ver más