Cost diviation in road construction projects: The case of Palestine

Ibrahim Mahamid    
Amund Bruland    

Resumen

This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004?2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width) and the cost diverge is discussed.

 Artículos similares

       
 
Shayan Jorjam, Mohammed Mawlana and Amin Hammad    
The traditional method of installing underground utilities (e.g., water, sewer, gas pipes, electrical cables) by burying them under roads has been used for decades. However, the repeated excavations related to this method cause problems, such as traffic ... ver más
Revista: Infrastructures

 
Vivek Sharma, Carlos H. Caldas, Dhaval Gajjar and Prajakta Bapat    
Healthcare facilities (HCFs) are complex building structures that are becoming more challenging with ever-changing codes and regulations. Previously completed projects become a basis for future guidance regarding costs and scope. A robust normalization f... ver más
Revista: Buildings

 
Christian Haas, Philipp Klaus Thumser, Michael Hellmair, Tyler J. Pilger and Martin Schletterer    
With the globally increasing awareness regarding the interconnectivity between freshwater ecosystems, projects for re-establishing connectivity with fishways as well as stock management are increasing. To ensure the quality and impact of such projects an... ver más
Revista: Water

 
Haneul Lee and Seokheon Yun    
Accurately predicting construction costs during the initial planning stages is crucial for the successful completion of construction projects. Recent advancements have introduced various machine learning-based methods to enhance cost estimation precision... ver más
Revista: Buildings

 
Fan Ding, Min Liu, Simon M. Hsiang, Peng Hu, Yuxiang Zhang and Kewang Jiang    
The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework bas... ver más
Revista: Buildings