Redirigiendo al acceso original de articulo en 15 segundos...
ARTÍCULO
TITULO

Green-Lean conceptual integration in the project design, planning and construction

Patricia Martínez    
Vicente González    
Eduardo Da Fonseca    

Resumen

Current competitiveness scenario in which engineering companies act, demands new production approaches, where the environmental variables play a key role. In such a way, the sustainability concept should begin to be managed by all the agents involved: engineers, architects, owners, among others. Sustainability concept, being of general character, has remained in a conceptual context, becoming difficult the development of tools that facilitate its consideration through the entire project life cycle. This study had as purpose to integrate the philosophies of Sustainable Construction, or Green Building, and Lean Construction, the latter employee as the necessary complement to give an analysis baseline focused on the production management. The design, planning and construction stages were defined as the enclosed life cycle, being determined integration vectors by means of the morphological analysis and cross-impact matrix. The vectors with direct relationship for the implementation of the Green-Lean integration were determined. As implementation tool of the Green-Lean integration, Constructability was used which allowed sequencing the construction processes. This conceptual exercise was only applied at design level. As a result, at conceptual level was stated that the tools applied in the project management (Lean Construction and Constructability), give a sound support for the implementation, and future application, of Sustainability criteria in the processes and stages involving the whole project life cycle.Rev. ing. constr. [online]. 2009, vol.24, n.1, pp. 05-32. ISSN 0718-5073.  http://dx.doi.org/10.4067/S0718-50732009000100001

 Artículos similares

       
 
Lelin Lv, Canjun Chen and Zhuofu Wang    
The tendency of infrastructure projects to be complex, large-scale, and long-term prompts temporary project organizations? need to have resilience to deal with various risks, uncertainties, and crises. The resource and cognitive capacity of stakeholders ... ver más
Revista: Buildings

 
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature, Renuka Silva    
This study primarily identifies the knowledge gaps that must be filled to apply conceptualised methods for rising and benchmarking productivity levels of various construction operational tasks. Accordingly, this study intended to evaluate labour producti... ver más

 
Jonathan Dortheimer, Stephen Yang, Qian Yang and Aaron Sprecher    
Architectural design decisions are primarily made through an interaction between an architect and a client during the conceptual design phase. However, in larger-scale public architecture projects, the client is frequently represented by a community that... ver más
Revista: Buildings

 
Jaime Perez-Martinez and Rodrigo Perez Fernandez    
Since the introduction of scientific disciplines into the shipbuilding process, there has been a search for optimisation of human and material resources. The current environmental crisis is putting additional pressure on global resource management and sp... ver más

 
Fan Zhang, Melissa Petersen, Leigh Johnson, James Hall, Raymond F. Palmer, Sid E. O?Bryant and on behalf of the Health and Aging Brain Study (HABS?HD) Study Team    
The Health and Aging Brain Study?Health Disparities (HABS?HD) project seeks to understand the biological, social, and environmental factors that impact brain aging among diverse communities. A common issue for HABS?HD is missing data. It is impossible to... ver más
Revista: Informatics