Redirigiendo al acceso original de articulo en 23 segundos...
Inicio  /  Hydrology  /  Vol: 4 Núm: 3 Par: Septemb (2017)  /  Artículo
ARTÍCULO
TITULO

Groundwater Engineering in an Environmentally Sensitive Urban Area: Assessment, Landuse Change/Infrastructure Impacts and Mitigation Measures

Yohannes Yihdego    
Cara Danis and Andrew Paffard    

Resumen

No disponible

 Artículos similares

       
 
Ivan Kovac, Marko ?rajbek, Nikolina Kli?anin and Gordon Gilja    
The localization of pollution sources is one of the main tasks in environmental engineering. For this paper, models of spatial distribution of nitrate concentration in groundwater were created, and the point of highest concentration was determined. This ... ver más
Revista: Hydrology

 
Walaa Elnashar, Hany F. Abd-Elhamid, Martina Zelenáková and Ahmed Elyamany    
Excessive irrigating water that has not been adequately drained may cause more water to enter the crop root zone than is necessary. As a result, issues with increasing water table levels, waterlogging, and salinity get worse and cause crop productivity l... ver más
Revista: Water

 
Yuxiang Liu, Guanqun Ma, Yu Han, Yubo Wang, Cui Tang, Ning Tian, Xiaoshan Tang, Lulu Jiang, Hanyue Zuo, Yuexing Zhang, Shanlin Wang, Ao Wang, Deqiang Mao and Shiliang Liu    
The assessment of the impact of abandoned mine water on the underwater environment is critical for protecting and restoring the groundwater environment. Taking the abandoned coal mining area in the west of Zhangqiu District as the engineering background ... ver más
Revista: Water

 
Charalampos Konstantinou and Giovanna Biscontin    
Fluid injection in a porous medium is the underlying mechanism for many applications in the fields of groundwater hydraulics, hydrology and hydrogeology, and geo-environmental engineering and in the oil and gas industry. Fluid flow experiments in porous ... ver más
Revista: Hydrology

 
Candan Gokceoglu, Ebu Bekir Aygar, Hakan A. Nefeslioglu, Servet Karahan and Suat Gullu    
The T26 tunnel was designed within the scope of the Ankara-Istanbul high-speed railway in accordance with the speed of 250 km/h. Some serious problems and excessive deformations were encountered during the excavation works. The deformations in the tunnel... ver más
Revista: Infrastructures