Redirigiendo al acceso original de articulo en 19 segundos...
ARTÍCULO
TITULO

Discussions of the reschedule process of passengers, train operators and infrastructure managers in railway disruptions

Nuannuan Leng    
Ulrich Weidmann    

Resumen

In case of railway disruptions, the whole railway traffic will be impacted in a large area and for a long time. There are three stakeholders in railway disruption management process that cannot be neglected: passengers, train operators and infrastructure managers. Infrastructure managers are mainly responsible for operational feasibility of the rescheduled timetable. Train operators aim at minimizing operation costs and maximizing the services offered to passengers. Passengers? needs are an important evaluation for rescheduled timetable in railway disruptions. Since the three stakeholders have diverse and even conflicting objectives in the disruption management process, how to handle the trade-offs of these objectives deserves further discussion. This paper summarizes the possible methods to solve the holistic rescheduling process including passengers, train operators and infrastructure managers in railway disruptions. Specifically, this paper discusses two reschedule process and compare their pros and cons. This research links passengers, train operators and infrastructure managers in the rescheduling process of disruption management. It is the base for solving the trade-offs of different objectives of stakeholders.

 Artículos similares

       
 
Dai Xianyao, Wang Guobin, Ye Ming and Zhang Yongquan    
With the growing demand for transportation, there has been a significant increase in road-related projects, leading to potential risks in the safety of existing structures. This paper presents a study on the influence of new tunnel construction on the st... ver más
Revista: Applied Sciences

 
Mikel Labayen, Laura Medina, Fernando Eizaguirre, José Flich and Naiara Aginako    
The automation of railroad operations is a rapidly growing industry. In 2023, a new European standard for the automated Grade of Automation (GoA) 2 over European Train Control System (ETCS) driving is anticipated. Meanwhile, railway stakeholders are alre... ver más
Revista: Applied Sciences

 
Roberto Boccagna, Maurizio Bottini, Massimo Petracca, Alessia Amelio and Guido Camata    
In the last few decades, structural health monitoring has gained relevance in the context of civil engineering, and much effort has been made to automate the process of data acquisition and analysis through the use of data-driven methods. Currently, the ... ver más

 
Lingzhi Yin and Yafei Wang    
Delving into the spatiotemporal evolution of the railway network in different periods can provide guidance and reference for the planning and layout of the railway network. However, most of the existing studies tended to model the railway data separately... ver más

 
Yuan Jin, Ainong Li, Jinhu Bian, Xi Nan and Guangbin Lei    
Land use change (LUC) can be affected by investment growth and planning policies under the context of regional economic cooperation and development. Previous studies on land use simulation mostly emphasized the effects of local socioeconomic factors and ... ver más