Revistas
Artículos
Publicaciones CPI
Documentos de Interés
REVISTA
Sustainability
TODAS
Redirigiendo al acceso original de articulo en
19
segundos...
Inicio
/
Sustainability
/
Vol: 11 Núm: 5 Par: March-1 (2019)
/
Artículo
ARTÍCULO
TITULO
Cost Adjustment in the Korean Defense Industry: Empirical Research on the Relation between Earnings Management and Sustainability
Resumen
No disponible
Acceso
PÁGINAS
NÚMERO
Volumen: 11 Número: 5 Parte: March-1 (2019)
MATERIAS
INFRAESTRUCTURA
REVISTAS SIMILARES
Buildings
Water
IJTI (International Journal Of Transportation And Infrastructure)
Artículos similares
Advanced-Technological UAVs-Based Enhanced Reconstruction of Edges for Building Models
Acceso
Luping Li, Jian Chen, Xing Su and Ahsan Nawaz
Accurate building models are widely used in the construction industry in the digital era. UAV cameras combined with image-based reconstruction provide a low-cost technology for building modeling. Most existing reconstruction methods operate on point clou...
ver más
Revista:
Buildings
COST ESCALATION ANALYSIS (PRICE ADJUSTMENT) ON MULTI YEARS INFRASTRUCTURE PROJECTS (PLUAL YEARS)(Case Study: Kalimati Long Storage Development Project for Raw Water in Sidoarjo Regency)
Acceso
Anisa Meiyanur, Diah Ayu Restuti Wulandari
Pág. 23 - 29
Revista:
IJTI (International Journal Of Transportation And Infrastructure)
Three Vectors Model Predictive Torque Control Without Weighting Factor Based on Electromagnetic Torque Feedback Compensation
Acceso
Finite control set-model predictive torque control (FCS-MPTC) depends on the system parameters and the weight coefficients setting. At the same time, since the actual load disturbance is unavoidable, the model parameters are not matched, and there is a t...
ver más
Revista:
Energies
Reactive Power Planning for Regional Power Grids Based on Active and Reactive Power Adjustments of DGs
Acceso
Yangwu Shen, Feifan Shen, Yaling Chen, Liqing Liang, Bin Zhang and Deping Ke
To deal with extreme overvoltage scenarios with small probabilities in regional power grids, the traditional reactive power planning model requires a huge VAR compensator investment. Obviously, such a decision that makes a large investment to cope with a...
ver más
Revista:
Energies
The Relation between Pre-planning, Commissioning and Enhanced Project Performance
Acceso
Jesper Kranker Larsen, Søren Munch Lindhard, Thomas Ditlev Brunoe, Kim Noergaard Jensen
Pág. 1 - 14
Pre-planning of construction projects is important for the performance of cost, time, and quality. However, recent research finds that quality related to final testing, adjustment, and balancing of HVAC systems are often overlooked due to deadline pressu...
ver más
Revista:
Australasian Journal of Construction Economics and Building
Revistas destacadas
Infrastructures
Informed Infraestructure
BiT
Revista de la Construcción
Ver todas las revistas disponibles