THE MODEL FOR DETERMINING THE SEQUENCE OF WORKS AND OPERATIONS TO MANAGE THE TIMETABLE OF A CONSTRUCTION PROJECT

???? ??????????? ????????    
?????? ??????? ??????????    
????? ????????????? ?????    

Resumen

The subject matter is the issue of managing the content and schedule of a construction project. The goal of the article is to build structural models that determine the sequence and interrelation of works (and operations) of construction projects. The following tasks were solved: a model of the processes of project schedule management was built, a hierarchical structure of a construction project was developed taking into account the operation level, a precedence diagram was constructed for the level of works and operations. The following methods were used: the project approach, process modelling using IDEF0 diagrams, decomposition methods, the method of a precedence diagram.  The following results were obtained: the processes for managing the schedule of a project according to the PMBoK standard were analyzed, their features with were considered with reference to construction projects, as a result, a model of processes for managing construction project schedules presented in IDEF0 notation was built; the level of operations of the hierarchical structure of a construction project was considered; the factors of an enterprise that affect the list of operations were indicated; to compose operations, the decomposition method was used; the WBS-structure of the portfolio of construction projects, including three levels of hierarchy, was supplemented with the fourth level ? operations; the examples of some elements of the specified sets of construction project operations were given; the method of precedence diagrams was chosen for determining the sequence of operations; a precedence diagram which indicates inputs and outputs was constructed for the level of the structure operations; a precedence diagram for the level of operations of the project structure was also built in the context of the task of the project documentation development. Conclusions. After establishing the sequence and logical relationship at the level of operations, taking into account the precedence diagram at the level of work, a model of the sequence of a group of operations, groups of work and then the entire project can be built. Taking into consideration the data on the duration of operations, this model will enable assessing the duration of the entire project. This will provide a reliable assessment of resources and the duration of operations. The result will be a project schedule with detailed project content.

 Artículos similares

       
 
Francesco Fusco, Pantaleone De Vita, Benjamin B. Mirus, Rex L. Baum, Vincenzo Allocca, Rita Tufano, Enrico Di Clemente and Domenico Calcaterra    
On the 4th and 5th of March 2005, about 100 rainfall-induced landslides occurred along volcanic slopes of Camaldoli Hill in Naples, Italy. These started as soil slips in the upper substratum of incoherent and welded volcaniclastic deposits, then evolved ... ver más
Revista: Water

 
Tienan Li, Xueting Zeng, Cong Chen, Xiangmin Kong, Junlong Zhang, Ying Zhu, Fan Zhang and He Dong    
In this study, an initial water-rights allocation (IWRA) model is proposed for adjusting the traditional initial water-rights empowerment model based on previous water intake permits, with the aim of improving the productivity of water resources under po... ver más
Revista: Water

 
Jiajia Pan and Hung Tao Shen    
A two-dimensional wave model coupled with ice dynamics is developed to evaluate ice effects on shallow water wave propagation on a beach and in a channel. The nonlinear Boussinesq equations with ice effects are derived and solved by the hybrid technique ... ver más
Revista: Water

 
Tianlong Jia, Hui Qin, Dong Yan, Zhendong Zhang, Bin Liu, Chaoshun Li, Jinwen Wang and Jianzhong Zhou    
Traditional reservoir operation mainly focuses on economic benefits, while ignoring the impacts on navigation. Thus, the economic operation of reservoirs considering navigational demands is of great significance for improving benefits. A navigation capac... ver más
Revista: Water

 
Igor Paz, Bernard Willinger, Auguste Gires, Bianca Alves de Souza, Laurent Monier, Hervé Cardinal, Bruno Tisserand, Ioulia Tchiguirinskaia and Daniel Schertzer    
Recent studies have highlighted the need for high resolution rainfall measurements for better modelling of urban and peri-urban catchment responses. In this work, we used a fully-distributed model called ?Multi-Hydro? to study small-scale rainfall variab... ver más
Revista: Water