Critical Infrastructure Renewal: A Framework for Fuzzy Logic Based Risk Assessment and Microscopic Traffic Simulation Modelling

MD Jahedul Alam    
Muhammad Ahsanul Habib    
Kevin Quigley    

Resumen

This paper presents a comprehensive framework for risk assessment and micro simulation modelling to assess traffic impacts during re-decking of a major suspension bridge identified as Critical Infrastructure (CI) in Halifax, Canada. The bridge is being replaced while maintaining traffic during day time. As re-decking is relatively a rare and unknown construction event for a Cable Bridge, unexpected risk event and uncertainty would be associated with complex engineering manoeuvring during the re-decking of the bridge. Therefore, this study proposes a fuzzy logic approach to estimate the construction related bridge opening delay, and subsequently develops a micro simulation-based traffic network model to assess the traffic impacts on transport network. Weather data, traffic volume and signal data obtained from multiple data sources have been used during the risk assessment and micro simulation modelling. The results suggest that the likelihood of bridge opening delay could range from 18%-30% for an hour period to 40% for 3 hour period depending on the level of consequence on any day in December. The average potential delay is obtained as 22 minutes, 1.5 hours, and 2.6 hours for low consequence, medium consequence, and high consequence respectively. Based on the delay analysis, this study evaluates three alternative bridge opening delay scenarios. It is observed that the increment in number of operating vehicles becomes steady at 30% suggesting the network has reached its capacity. The results also reveals that any delay over 2 hours in bridge opening would add a slight change to the impacts on the network. This study will help policy-makers to develop risk mitigation plans and contingencies to ensure better management of traffic during 18 months long re-decking of this critical infrastructure.

 Artículos similares

       
 
Mark A. Denisenko, Alina S. Isaeva, Alexander S. Sinyukin and Andrey V. Kovalev    
The fast, convenient, and accurate determination of railroad cars? load mass is critical to ensure safety and allow asset counting in railway infrastructure. In this paper, we propose a method for modeling the mechanical deformations that occur in the ra... ver más
Revista: Infrastructures

 
Véronique Georlette, Anne-Carole Honfoga, Michel Dossou and Véronique Moeyaert    
In the dynamic landscape of 6G and smart cities, visible light communication (VLC) assumes critical significance for Internet of Things (IoT) applications spanning diverse sectors. The escalating demand for bandwidth and data underscores the need for inn... ver más
Revista: Future Internet

 
Joana Carneiro, Dália Loureiro, Marta Cabral and Dídia Covas    
This paper presents and demonstrates a novel scenario-building methodology that integrates contextual and future time uncertainty into the performance assessment of water distribution networks (WDNs). A three-step approach is proposed: (i) System context... ver más
Revista: Water

 
Molusiwa Ramabodu and Tholang David Nena    
Despite South Africa?s unique demographics, shaped by a history of apartheid and ongoing inequality, its built environment has so far been unable to extricate itself from its inglorious past. This portends that the quality and impact of infrastructure de... ver más
Revista: Buildings

 
Rosana Farjaminejad, Samira Farjaminejad, Ludovica Nucci, Fabrizia d?Apuzzo, Vincenzo Grassia, Korosh Majidi and Abdolreza Jamilian    
The integration of 3D printing technology in maxillofacial surgery in Iran represents a significant advancement in medical practice, offering unprecedented precision and efficiency in surgical procedures. Employing the Non-Adoption, Abandonment, Scale-Up... ver más
Revista: Applied Sciences