Portada: Infraestructura para la Logística Sustentable 2050
DESTACADO | CPI Propone - Resumen Ejecutivo

Infraestructura para el desarrollo que queremos 2026-2030

Elaborado por el Consejo de Políticas de Infraestructura (CPI), este documento constituye una hoja de ruta estratégica para orientar la inversión y la gestión de infraestructura en Chile. Presenta propuestas organizadas en siete ejes estratégicos, sin centrarse en proyectos específicos, sino en influir en las decisiones de política pública para promover una infraestructura que conecte territorios, genere oportunidades y eleve la calidad de vida de la población.
ARTÍCULO
TITULO

Enhancing Construction Project Workflow Reliability through Observe?Plan?Do?Check?React Cycle: A Bridge Project Case Study

Ashtad Javanmardi    
Chuanni He    
Simon M. Hsiang    
S. Alireza Abbasian-Hosseini and Min Liu    

Resumen

This research aims to determine the appropriate level of effort required for each step of the Observe?Plan?Do?Check?React (OPDCA) cycle to improve the workflow reliability of a construction project. Empirical data on detailed weekly meeting minutes over 18 weeks and the planned and actual starting and finish times of 475 activities were collected from a bridge construction case project. The information theory approach was utilized to measure the information gained from discussions pertaining to the OPDCA cycle during weekly planning meetings. Cooperative game theory and the Shapley notation of fairness were used to compute the contribution of each OPDCA step to workflow reliability. Results showed that ?Observe?, ?Plan?, ?Do?, ?Check?, and ?reAct?, contributed 18%, 23%, 23%, 24%, and 12% to observed variations in workflow reliability measured by the percent plan complete (PPC). Also, findings revealed that synergy exists between the ?Check? step and other steps in the OPDCA cycle. The methodology developed in this paper has potential implications for engineering managers. The method can be generalized to help project managers find the balance between planning and control efforts to improve workflow. It also provides proven techniques for continuous improvement during project execution to facilitate project success. Furthermore, at the organizational level, the developed method can help higher-level managers make informed investment decisions for employees? training and development to improve performance in future projects.

Artículos similares

Hemos preparados una selección de otros artículos que pudieran ser de tu interés
Enrique Arias, Virginia Barba-Sánchez, Carmen Carrión and Rafael Casado    
New master?s degrees in computer engineering, designed according to Spanish government requirements, include both technical and business subjects to provide advanced knowledge compared to undergraduate studies. In spite of acquiring this advanced knowled... ver más
Zohar Laslo, Gregory Gurevich     Pág. 53 - 69
Prevalent control routines are generally based on traditional deterministic models that in situations of short time float and scanty budgets are often unable to deliver complex projects ?on time within budget.? Because it does not take uncertainties into... ver más
Revista: Management
Yazan Alqudah,Esam Qaralleh,Michelle Mace     Pág. pp. 21 - 26
Engineering education is constantly challenged to bridge the gap between classroom and real world problems. This paper reports on the experience at PSUT to complement the teaching of digital signal processing through project-based learning. A low cost di... ver más
Xuezhou Fan and Toru Matsumoto    
The recent increase in rainstorm waterlogging disasters has acutely threatened sustainable urban development in China. Traditional strategy to solve this problem is drainage capacity enhancing projects, which aims at enlarging the discharge of water. Rec... ver más
Revista: Environments