Inicio  /  Applied Sciences  /  Vol: 12 Par: 12 (2022)  /  Artículo
ARTÍCULO
TITULO

Fuzzy Multi-Mode Time?Cost?Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects

Serges Mendomo Meye    
Guowei Li    
Zhenzhong Shen and Jingbin Zhang    

Resumen

Along with the increased use of water resources, some large water conservancy projects began construction to address power supply shortages and control flooding and drainage. As investment grows, construction cycles lengthen, external environmental impacts become bigger, and civil engineering project management becomes more complex. The real aim of the hydraulic-structure engineering project model is to manage ways of delivering the project on time while maintaining reasonable quality standards and building costs, to optimize project value. We note that the trade-off between conflicting objectives in a water conservancy project in an uncertain environment is a difficult task. To simulate the relationship between a project?s construction quality and its time limit, two new piecewise functions?a double exponential function and a quadratic function?were proposed, and then a fuzzy multi-mode discrete time?cost?quality trade-off concept for water-management projects was established. This model finds the best solution to an NP-hard problem using the particle-swarm optimization algorithm (PSO). A comparison of the calculations to previous studies validates the model and its computational approach. The optimized results of a water conservation project are provided as a conceptual framework for project planning and construction timeframes.

 Artículos similares

       
 
Lei Jiang and Ziyue Zeng    
Since the impoundment of the Three Gorges Project, the downstream hydrology and river dynamics have been modified. The Yichang?Chenglingji Reach (YCR), as a part of the mainstream of the Middle Yangtze River, has consequently been significantly scoured, ... ver más
Revista: Water

 
Md. Khairul Hasan, Mohamed Rasmy, Toshio Koike and Katsunori Tamakawa    
The Sangu River basin significantly contributes to national economy significantly; however, exposures to water-related hazards are frequent. As it is expected that water-related disasters will increase manifold in the future due to global warming, the Go... ver más
Revista: Water

 
Yu Zhang, Xiangqiao Wang, Yuwen Yang and Bo Chen    
China has a vast territory and a long history of inland navigation. This paper is based on the Shaying River Shenqiu hub project, and a normal physical model with a geometric scale of 65 was established to simulate the characteristics of water and sedime... ver más
Revista: Water

 
Yunxia Lu, Hao An, Chao Li and Changmin Liu    
The potential environmental impact and increased operational costs associated with the upgrading and renovation of sewage treatment plants are acknowledged. This study employs the upgrading and expansion project of a municipal sewage plant in Dongguan Ci... ver más
Revista: Water

 
Tao Wang, Yu Xiang, Liyuan Liu and Wang Xiong    
Relying on the Mawan undersea large-diameter, dual-line, mud?water-balanced shield tunnel project and focusing on the characteristics of the tunnel, such as the complex geological conditions at the expected intersection location and the existence of a su... ver más