Inicio  /  Infrastructures  /  Vol: 5 Par: 9 (2020)  /  Artículo
ARTÍCULO
TITULO

Cost Overruns in Tunnelling Projects: Investigating the Impact of Geological and Geotechnical Uncertainty Using Case Studies

Chrysothemis Paraskevopoulou and Georgios Boutsis    

Resumen

Tunnelling projects seldom meet the initial budget requirements. Commonly, these types of projects suffer from cost overruns, which subsequently lead to project delivery delays mainly due to unsuccessful ground investigation as specified in the literature. The presented work scrutinises the effect of ground investigation in cost overruns. More specifically, various cost figures (total cost, construction cost, tunnel cost) are analysed for two case studies i) the Channel tunnel in the UK and ii) the Olmos Tunnel in Peru. Clayton?s relation between ground investigation and the construction cost is utilised and further investigated. In the Channel tunnel, the main problems faced led to a cost overrun of 78% for the total cost, 66% for the construction cost and 77% for the tunnelling cost. In the Olmos tunnel, two main geological scenarios are analysed and the construction cost overrun is calculated at 9.6% and 6.7%. Drawing on the conclusions, this research work proves that ground investigation can be one of the major factors influencing the tunnel cost.

 Artículos similares

       
 
Shumank Deep, Shankar Banerjee, Saurav Dixit and Nikolai Ivanovich Vatin    
Highway construction projects have always suffered from cost overruns due to extended project delivery, causing a loss of public funds. Since highways are the backbone of a nation, the purpose of this study is to measure the criticality of the factors th... ver más
Revista: Buildings

 
Irwan Irwan,Melloukey Ardan,Nuril Mahda Rangkuti,Febrina Monalisa     Pág. 20 - 29
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were groupe... ver más

 
Ayodeji Olatunji Aiyetan and Dillip Kumar Das    
Mega-projects, particularly for the development of infrastructure, are being undertaken increasingly in many developing countries. Mega-projects are highly complex and involve significant construction activities. However, mega-projects in Africa face cri... ver más
Revista: Infrastructures

 
Um E Hani Habib, Abdur Rehman Nasir, Fahim Ullah, Siddra Qayyum and Muhammad Jamaluddin Thaheem    
Building information modeling (BIM) through data-rich digital representation has revolutionized the architecture, engineering, and construction (AEC) industry. BIM implementation in the AEC industry has noticeably increased over the last decade. Various ... ver más
Revista: Buildings

 
Daniel C. Londoño Tamayo, Walter M. Villa-Acevedo and Jesús M. López-Lezama    
Optimal reactive power dispatch plays a key role in the safe operation of electric power systems. It consists of the optimal management of the reactive power sources within the system, usually with the aim of reducing system power losses. This paper pres... ver más
Revista: Computers