Excavation and Construction Technology of Diversion Tunnel under Complex Geological Conditions

Na He and Xianggang Zhang    

Resumen

During the construction of a diversion tunnel, geological problems often include faults, fragile strata, hard rock formations, karst landforms, etc., which may have adverse effects on the excavation and construction of the diversion tunnel. Based on the analysis of the engineering overview, this study designed a new construction technology for the excavation of water diversion tunnels in hard rock layers and high-karst areas. Based on tunnel seismic prediction (TSP) technology to achieve advanced geological prediction, combined with actual geological conditions, construction difficulties are analyzed. Then, detection technology is used to collect two-way travel time, amplitude, and waveform data. By processing and analyzing the detection image, the spatial orientation and length of the main tunnel during the construction of the diversion tunnel are calculated. After completing the construction ventilation and wind, water, and electricity layout, the excavation construction procedure is designed. In the specific excavation design, the tunnel curtain excavation technology, tunnel body excavation and support technology, excavation grouting technology, important unfavorable geological tunnel section excavation technology, upper/lower flat section excavation technology, upper/lower curved section excavation technology, and vertical shaft section excavation technology were elaborated. Finally, a plan was made for the reuse process of slag material and a construction quality control system was established. During the testing process, it was found that the antidamage coefficient of the side wall was above 0.9 after using the technology described in this article. Therefore, it indicates that the excavation construction technology designed in this article can ensure the support capacity of the side wall of the diversion tunnel, which is suitable for the excavation of the main tunnel during the construction of the diversion tunnel.

 Artículos similares

       
 
Zuliang Zhong, Tenglong Tang and Yapeng Li    
The mechanical properties of the surrounding rock of the Xigeda stratum are easily affected by water content. In order to obtain the support characteristics of Xigeda strata, the finite difference method was used to obtain the longitudinal deformation of... ver más
Revista: Applied Sciences

 
Ning Sun, Xiaokai Li, Shanggao Li, Dake Hu, Mengjiao Hu, Faming Zhang, Yiyan Zhong, Menglong Dong and Zinan Li    
The surrounding rock stability of large underground caverns in a pumped storage power station is one of the most crucial problems in hydropower project design and construction. In the construction of hydropower projects in Southwest China, many undergrou... ver más
Revista: Applied Sciences

 
Tong Jiang, Xun Pei, Wenxue Wang, Longfei Li and Shihao Guo    
The tailwater tunnel of the Wuyue pumped storage power station is located in bedrock and extends to depths between tens and hundreds of meters. It is impossible to analyze and evaluate the whole engineering area from geological exploration data, and the ... ver más
Revista: Applied Sciences

 
Yue Jiang, Yanlin Li, Aijun Yao, Xiangzhi Gao and Hui Li    
In recent years, there has been a rise in the construction of expansive underground structures and shield tunnels with exceptionally large diameters. These projects introduce unique challenges regarding their impact on the surrounding soil and structures... ver más
Revista: Applied Sciences

 
Bo Wang, Jun Hu, Xiaoqi Lin and Hui Zeng    
In this study, the engineering background of No. 2 complex connecting passage of Binhu Road Station/Jinhu Square Station of Nanning Metro Line 3 is investigated, where the artificial ground freezing technique is adopted. A three-dimensional finite elemen... ver más