Effects of Contractual Governance on IT Project Performance under the Mediating Role of Project Management Risk: An Emerging Market Context

Ayesha Saddiqa    
Muhammad Usman Shehzad and Muhammad Mohiuddin    

Resumen

In this study, we explore the impact of contractual governance (CG) on project performance (PP) under the mediation of project management risk (PMR). Contractual governance influences favorably IT projects performance in an emerging market context where the IT sector is growing. The principal-agent theory is used to build a research model that schedules project governance and IT project risk management. Data were collected from 295 IT professionals and the response rate was 73.75%. Smart PLS was employed to test proposed relationships. The findings postulate a strong causal relationship between the CG, PP and PMR. Fundamental elements (FE), change elements (CE), and governance elements (GE) have a significant positive relationship with project management risk (PMR), and PMR positively affects PP. Additionally, PMR mediates the relationship of FE, CE and GE with PP. Overall, the results of the study provide pragmatic visions for IT industry practitioners and experts, but the unscheduled risk to the IT industry may bring enormous harm. Consequently, effective and well-structured governance in a strategic way tends to improve the project performance by monitoring and managing both project risk and quality. In addition, the study empirically supports the significant impacts of project governance dimensions i.e., fundamental elements, change elements and governance elements on project management risk and project performance. It also guides researchers and adds value to the project performance-related literature by filling the gap.

 Artículos similares

       
 
Mehran Vahedi Nikbakht, Mohammad Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, Reza Moezzi and Amir Vadiee    
Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) a... ver más
Revista: Infrastructures

 
Lei Jiang and Ziyue Zeng    
Since the impoundment of the Three Gorges Project, the downstream hydrology and river dynamics have been modified. The Yichang?Chenglingji Reach (YCR), as a part of the mainstream of the Middle Yangtze River, has consequently been significantly scoured, ... ver más
Revista: Water

 
Mingming Yang, Changhai Qin, Yongnan Zhu, Yong Zhao, Guohua He and Lizhen Wang    
Inter-basin water transfer (IBWT) projects are an effective means of addressing regional water resource imbalances. However, owing to the long construction cycle, large investment amount, and wide impact range, water diversion projects exhibit delayed an... ver más
Revista: Water

 
Shuting Xu and Jinming Xu    
The construction of deep foundation pits in subway stations can affect the settlement of existing buildings adjacent to the pits to varying degrees. In this paper, the Long Short-Term Memory neural network prediction model of building settlement caused b... ver más
Revista: Applied Sciences

 
Jin Hun Park and Pavel Pereslavtsev    
Research and development of the DEMOnstration power plant (DEMO) breeder blanket (BB) has been performed in recent years based on a predefined DEMO tritium breeding ratio (TBR) requirement, which determines a loss of wall surface due to non-breeding in-v... ver más
Revista: Applied Sciences