Water Turbine Simulation using Autodesk Simulation CFD

Suwarsono Suwarsono    
Budiono Budiono    

Resumen

The need on electricity increases annually while its supply decreases, meanwhile power plant has not increased. Process of building microhydro power plant needs scientifically experience and more time to give suitable result as it designed. Sengkaling Cross-flow Microhydro power plant resulted inappropriate electricity power compare with designed power plant. The design is mostly not in accordance with planned calculation. It is caused by the engineer who is not considering surrounding condition. Therefore, simulation is very important to be conducted that it only needs short time to the design maximally arranged. By simulation, building and assembling process can be conducted faster and decreases error risks. Simulation for this research used AUTODESK SIMULATION CFD.

 Artículos similares

       
 
José Antonio Romero Paguay,Tania Carbonell Morales,Viviana Fernanda Quevedo Tumailli     Pág. 154 - 162
Este artículo presenta la simulación de un sistema de refrigeración solar por absorción como una alternativa para la climatización de edificaciones en climas cálidos y húmedos.Esta simulación fue realizada empleando el programa TRNSYS 17; muy usado actua... ver más

 
Oelof De Meyer, Richard Okou, Adoniya Benaya Sebitosi, Pragasen Pillay    
This paper presents the results of the design parameters that affect natural convection of Low Pressure (LP) Solar Water Heaters (SWH) in South Africa. Fluid flow plays an important role in the heat transfer process associated with natural convection. Th... ver más