Portada: Infraestructura para la Logística Sustentable 2050
DESTACADO | CPI Propone - Resumen Ejecutivo

Infraestructura para el desarrollo que queremos 2026-2030

Elaborado por el Consejo de Políticas de Infraestructura (CPI), este documento constituye una hoja de ruta estratégica para orientar la inversión y la gestión de infraestructura en Chile. Presenta propuestas organizadas en siete ejes estratégicos, sin centrarse en proyectos específicos, sino en influir en las decisiones de política pública para promover una infraestructura que conecte territorios, genere oportunidades y eleve la calidad de vida de la población.
ARTÍCULO
TITULO

Project Management Performance Assessment in the Non-Profit Sector

John Lannon    

Resumen

As the non-profit sector becomes increasingly dependent on projects to achieve its strategic goals, the use of formal project management processes can help to demonstrate to stakeholders that an organisation is taking steps to improve its performance. However the adoption of processes drawn from the for-profit sector does not always yield the desired results. In particular existing performance management systems and quality management systems are unsuitable for the implementation, measurement, and improvement of project management practices in the sector. A new model is therefore proposed for non-profit project management performance assessment. This is based on a conceptual analysis of the European Foundation for Quality Management (EFQM) business excellence model, a project management performance assessment model used primarily in for-profit environments, and an assessment of criteria particular to non-profit organisations. The model is multi-dimensional, flexible, and accounts for multiple stakeholder views. After using it, non-profit organisations can reflect on their performance, create an improvement plan, and use the model again to test their progress.

Artículos similares

Hemos preparados una selección de otros artículos que pudieran ser de tu interés
Thordur Vikingur Fridgeirsson, Helgi Thor Ingason, Haukur Ingi Jonasson and Helena Gunnarsdottir    
The aim of this paper is to study the main areas in which artificial intelligence (AI) will impact the field of project management in relation to cost, risk and scheduling. The research model was based on a previous study of the ten project management kn... ver más
Revista: Applied Sciences
Valentin Nikolaenko and Anatoly Sidorov    
The purpose of this article is to analyze the most popular maturity models in order to identify their strengths and weaknesses. Research conducted by international project management communities such as Software Engineering Institute (SEI), Project Manag... ver más
Rajenlall Siriram     Pág. 100 - 114
This paper makes a contribution to knowledge by proposing a project management (PM) investigative framework with seven constructs and 60 sub-scales. The research consisted of an eight- step process. First, a project management assessment (PMA) tool was d... ver más
Alberto Cerezo-Narváez, Andrés Pastor-Fernández, Manuel Otero-Mateo and Pablo Ballesteros-Pérez    
Organizations undertaking construction projects often deal with uncertainty and complexity. Risks include a wide range of occurrences that can lead to project failure. However, these difficulties may be minimized if risks are properly managed. In additio... ver más
Revista: Sustainability
Ayodeji Olatunji Aiyetan and Dillip Kumar Das    
Infrastructure project delivery, specifically the delivery of water infrastructure projects, is a serious challenge in South Africa. Therefore, using the study context of water utility agencies in South Africa, the objective of this study was to examine ... ver más
Revista: Infrastructures