ARTÍCULO
TITULO

RESEARCH OF DIKW AND 5C ARCHITECTURAL MODELS FOR CREATION OF CYBER-PHYSICAL PRODUCTION SYSTEMS WITHIN THE CONCEPT OF INDUSTRY 4.0

Sergei Osadchy    
Nataliia Demska    
Yuriy Oleksandrov    
Viktoriia Nevliudova    

Resumen

The development of cyber-physical production systems is a complex scientific and technical task, therefore the developer needs to determine the requirements, tasks for the system being developed and choose an architectural model for its implementation. In turn, the choice of an architectural model assumes a balance for the set of requirements of persons interested in its development. In a typical case, the development of a specific cyber-physical industrial systems needs to be adapted to the means of implementation, to the realities of its future use, maintenance and evolution. Subject matter of this study are architectural models for building complex cyber-physical production systems. Goal of this article is a study of architectural models DIKW and 5C, according to the results of the decomposition of which, in the future, it will be possible to carry out a mathematical description of elementary problems of each level and their physical or simulation modeling. To achieve this goal, it is necessary to solve the following tasks: analyze the DIKW model; analyze the architectural model 5C; compare the DIKW model and the 5C architectural model, using its structural decomposition into levels, information and command channels with feedback within each structure.  The research carried out is based on the methods of decomposition and formalized representation of systems. Conclusions: Based on the results of the decomposition at each structural level of the DIKW and 5C models, a decomposition structure was developed, which shows the main differences and general similarities of the models. It was revealed that the 5C model, as a common software shell that combines integrated sensors and actuators, is more suitable for solving problems of developing a cyber-physical production system, and the DIKW interpretation model is more suitable for solving problems of modifying existing systems at enterprises, and the choice of the model itself the development of a cyber-physical production system depends on the requirements of the customer, existing equipment, the level of its automation and the level of project financing.

 Artículos similares

       
 
Dierk Jugel     Pág. 17 - 35
Enterprise Architectures consist of a multitude of architecture elements, which relate in manifold ways to each other. Due to the high number of relationships between these elements, architectural analysis mechanisms are essential for all stakeholders to... ver más

 
Vadim V. Elisseev,Milos Puzovic,Eun Kyung Lee     Pág. 24 - 41
On the path to Exascale, the goal of High Performance Computing (HPC) to achieve maximum performance becomes the goal of achieving maximum performance under strict power constraint. Novel approaches to hardware and software co-design of modern HPC system... ver más

 
D. Ruiz, M. Silva, L. Cerón, C. López     Pág. Page 25 - 44
There are few studies on the behavior of historic structures of adobe and rammed earth in Latin America, which has contributed to the deterioration of these buildings, which are part of our architectural and cultural heritage. Colombia has 90% of its her... ver más

 
Alejandro Bonilla Castro, Rodrigo García Alvarado     Pág. 323 - 338
This paper sets a methodology to integrate solar thermal systems in BIM-software for the early architectural design of single houses in Concepción, Chile, using parametric families, programming in Dynamo, energy calculation with LadyBug and piping design... ver más

 
Aaron Manderson, Marcus Jefferies, Graham Brewer     Pág. 72 - 84
Building Information Modelling (BIM) is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC) sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle ... ver más