Portada: Infraestructura para la Logística Sustentable 2050
DESTACADO | CPI Propone - Resumen Ejecutivo

Infraestructura para el desarrollo que queremos 2026-2030

Elaborado por el Consejo de Políticas de Infraestructura (CPI), este documento constituye una hoja de ruta estratégica para orientar la inversión y la gestión de infraestructura en Chile. Presenta propuestas organizadas en siete ejes estratégicos, sin centrarse en proyectos específicos, sino en influir en las decisiones de política pública para promover una infraestructura que conecte territorios, genere oportunidades y eleve la calidad de vida de la población.
Redirigiendo al acceso original de articulo en 16 segundos...
ARTÍCULO
TITULO

Automation of Measuring Actual Productivity of Earthwork in Urban Area, a Case Study from Montreal

Adel Alshibani    

Resumen

The construction of a new facility in an urban area, such as a downtown area, involves considerable earthwork excavation most of the time. Measuring the actual productivity of earthwork operations that involve heavy machinery can be a complex task for project managers. The complexity contributes to the impact of the many factors involved, the required accuracy, and the uncertainties associated with such operations. Traditionally, measuring actual productivity is carried out manually by measuring the actual quantities of the excavated earth. Measuring actual productivity manually is time-consuming and not necessarily accurate. The paper presents a case study project in Montreal to investigate the application of a developed methodology that is affordable for small to medium size contractors. It integrates the GPS and fuzzy set theory as an alternate effective methodology for measuring actual onsite productivity during the construction stage in an urban area. The developed methodology combines GPS data that are collected in near real time, fuzzy set theory (FST), and Google Earth. FST is used to define the variability and uncertainty which exists in the duration of the main activities of the earthwork (loading, traveling, dumping, and returning). Google Earth is used for graphical presentation and to store the collected GPS data of the moving hauling units. The productivity estimated by the developed methodology was compared with that provided by a simulation-based model, in which the collected GPS data are used to define the duration of earthmoving moving operations, and with that measured manually by contractor. The developed methodology proves that the utilization of GPS data and FST can yield a more accurate estimation of onsite actual productivity compared to that provided by simulation-based approaches, but in much a simpler way regarding the computation effort and time.

Palabras claves

Artículos similares

Hemos preparados una selección de otros artículos que pudieran ser de tu interés
Yaowei Sun, Lei Lu, Fengzhou Wu, Songlu Xiao, Junjie Sha and Lei Zhang    
A complex surface measurement is important for quality control and manufacturing processes. Articulated arm coordinate measuring machines (AACMMs) are widely used in measuring the complex surface. However, the AACMMs that are currently used always requir... ver más
Revista: Actuators
V. I. Profatylov     Pág. 11 - 15
A method of the automated measuring of contact pressure of railway automatics relay is offered in the article. The method is based on the design features of railway automatics electromagnetic relays, in which the falling of the armature occurs under the ... ver más
p. Brink    
ENGLISH ABSTRACT: In-process measuring contributes towards automation in the manufacturing process and can also play an important role in quality by measuring characteristics during production. To enable one to effectively ... ver más
V. I. Profatylov     Pág. 16 - 21
A method of defining the position of relay anchor according to the magnetic resistance of a working air backlash is offered in the article. This method is based on the fact that the value of magnetic resistance of a working backlash does not virtually de... ver más