|
|
|
Luping Li, Jian Chen, Xing Su and Ahsan Nawaz
Accurate building models are widely used in the construction industry in the digital era. UAV cameras combined with image-based reconstruction provide a low-cost technology for building modeling. Most existing reconstruction methods operate on point clou...
ver más
|
|
|
|
|
|
Anisa Meiyanur, Diah Ayu Restuti Wulandari
Pág. 23 - 29
|
|
|
|
|
|
Finite control set-model predictive torque control (FCS-MPTC) depends on the system parameters and the weight coefficients setting. At the same time, since the actual load disturbance is unavoidable, the model parameters are not matched, and there is a t...
ver más
|
|
|
|
|
|
Yangwu Shen, Feifan Shen, Yaling Chen, Liqing Liang, Bin Zhang and Deping Ke
To deal with extreme overvoltage scenarios with small probabilities in regional power grids, the traditional reactive power planning model requires a huge VAR compensator investment. Obviously, such a decision that makes a large investment to cope with a...
ver más
|
|
|
|
|
|
Jesper Kranker Larsen, Søren Munch Lindhard, Thomas Ditlev Brunoe, Kim Noergaard Jensen
Pág. 1 - 14
Pre-planning of construction projects is important for the performance of cost, time, and quality. However, recent research finds that quality related to final testing, adjustment, and balancing of HVAC systems are often overlooked due to deadline pressu...
ver más
|
|
|