10   Artículos

 
en línea
Andreas Pramudya, Andreas Wibowo    
The Government of Indonesia implemented the Build, Operate, and Transfer (BOT) model, relying on private investment to bridge the financing gap in developing public infrastructure facilities, including toll roads. Toll road investments, like other greenf... ver más

 
en línea
Andreas Wibowo,Wahyu Wuryanti     Pág. pp. 70 - 76
The desired accuracy level of an estimate heavily relies on the availability of data and information at the time of preparing the estimate. However, an estimate often must be made when data and information are not complete. At earlier stages of project i... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

 
en línea
Andreas Wibowo     Pág. pp. 1 - 8
Program Evaluation Review Technique %28PERT%29 is a scheduling method that consider the uncertainty of the duration of an activity. It assumes a probability density function with a beta distribution. PERT simplifies the analysis using specific values of ... ver más
Revista: Civil Engineering Dimension    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »