Nhung Nguyen Hong and Huy Nguyen Duc
In recent years, with the rapid increase in renewable energy sources (RESs), a Virtual Power Plant (VPP) concept has been developed to integrate many small-scale RESs, energy storage systems (ESSs), and customers into a unified agent in the electricity m...
ver más
|
|
|
|
|
|
|
Hyobin Oh, Hansol Shin, Kyuhyeong Kwag, Pyeongik Hwang and Wook Kim
The complexity of modern power systems is increasing because of the development of various intermittent generators. In practical reliability evaluations, it is essential to include both the failure of conventional generators and the output characteristic...
ver más
|
|
|
|
|
|
|
Tran Anh Dung and Said M. Easa
Previous studies have addressed railway turnouts (switches and crossings), but research on the performance of 1000 mm gauge turnouts is limited. At present, wooden sleeper structures are used at turnouts in Vietnam. However, these structures have many di...
ver más
|
|
|
|
|
|
|
Mercedes Elena Zapata Mendoza
The present work has been developed in the La Libertad region, located on the north coast of Peru, specifically in the high Andean province of Santiago de Chuco and the coastal province of Virú; This research had the purpose to analyze the situ...
ver más
|
|
|
|
|
|
|
Kui Ji and Jianxiao Ma
Reserve capacity is the core of reliability analysis based on road network capacity. This article optimizes its bi-level programming model: the upper-level model has added service level coefficient and travel time limit, which realizes the unification of...
ver más
|
|
|
|
|
|
|
Yu-Tung Chen, Cheng-Chien Kuo and Jia-Zhang Jhan
This paper proposes a 24-h ahead unit commitment for a diesel-photovoltaic (PV)-battery system using mixed-integer linear programming (MILP) to minimize the operating cost which includes the power storage system (PSS) in the reserve capacity. Considering...
ver más
|
|
|
|
|
|
|
Irina Filimonikhina,Viktor Deikun,Iryna Ienina,Mareks Mezitis,Vladimir Pirogov,Guntis Strautmanis,Sergij Yakimenko
Pág. 59 - 66
This paper reports the established conditions for static self-balancing for the case of an asymmetric rotor on two isotropic elastic supports, balanced by a passive automatic balancer of any type. In general, the plane of static imbalance does not coinci...
ver más
|
|
|
|
|
|
|
Zhoufeng Wang, Xiangqi He, Chen Zhang, Jianwei Xu and Yujun Wang
As China is a mountainous country, a large quantity of the population has to live in mountainous areas due to limited living space. Most of them cluster along roads in areas with relatively poor traffic conditions. In view of the spatial-temporal change ...
ver más
|
|
|
|
|
|
|
Shashank Goyal and Diwakar Gupta
Many sharing-economy platforms operate as follows. Owners list the availability of resources, prices, and contract-length limits. Customers propose contract start times and lengths. The owners decide immediately whether to accept or decline each proposal...
ver más
|
|
|
|
|
|
|
Simone Peloso, Chiara Casarotti, Filippo Dacarro and Giuseppe Sinopoli
The purpose of the research was to study the response of existing constructions, designed for gravity loads only in the South of Italy, more precisely in the Sicily Region. The building is an existing two-story reinforced concrete structure, built in the...
ver más
|
|
|
|