|
|
|
Abdulah M. Alsugair, Naif M. Alsanabani and Khalid S. Al-Gahtani
Raising the final contract cost (FCC) is a significant risk for project owners. This study hypothesizes that the factors that cause owner?s cost estimation (OCE) accuracy and FCC changes share the same causes, and a case study confirmed that the two vari...
ver más
|
|
|