4   Artículos

 
en línea
Yu-Hung Chang, Chien-Hung Liu and Shingchern D. You    
The dynamic flexible job-shop problem (DFJSP) is a realistic and challenging problem that many production plants face. As the product line becomes more complex, the machines may suddenly break down or resume service, so we need a dynamic scheduling frame... ver más
Revista: Information    Formato: Electrónico

 
en línea
Yu-Hung Chien, Chung-Piao Chiang     Pág. 18 - 21
This study focuses on the problem of determining the optimal coverage period and selling price of warranted products from the manufacturer?s perspective. We first consider how to maximize the profit per unit under the assumption that the product can be s... ver más
Revista: Advances in Technology Innovation    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »