24   Artículos

 
en línea
Noaman Akbar Sheik, Peter Veelaert and Greet Deruyter    
BIM has become an intrinsic tool in managing building projects due to its ability to comprehensively represent information in digital form. However, using BIM as an information exchange tool is still in its infancy, particularly with regard to constructi... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Kuan Ren, Annan Jiang, Xinping Guo and Qinghua Min    
The section of Jialingjiang Road Station to Xiangjiang Road Station along Qingdao Metro Line 13 is located in Qingdao, China. All of them show obvious characteristics, being soft on the top and hard on the bottom, and the interval tunnel is faced with th... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq and Fahim Ullah    
The progress monitoring (PM) of construction projects is an essential aspect of project control that enables the stakeholders to make timely decisions to ensure successful project delivery, but ongoing practices are largely manual and document-centric. H... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Srijeet Halder, Kereshmeh Afsari, John Serdakowski, Stephen DeVito, Mahnaz Ensafi and Walid Thabet    
Construction progress monitoring involves a set of inspection tasks with repetitive in-person observations on the site. The current manual inspection process in construction is time-consuming, inefficient and inconsistent mainly due to human limitations ... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Paulius Kavaliauskas, Jaime B. Fernandez, Kevin McGuinness and Andrius Jurelionis    
Automated construction progress monitoring using as-planned building information modeling (BIM) and as-built point cloud data integration has substantial potential and could lead to the fast-tracking of construction work and identifying discrepancies. La... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Enrique Aldao, Luis M. González-deSantos, Humberto Michinel and Higinio González-Jorge    
In this work, a real-time collision avoidance algorithm was presented for autonomous navigation in the presence of fixed and moving obstacles in building environments. The current implementation is designed for autonomous navigation between waypoints of ... ver más
Revista: Drones    Formato: Electrónico

 
en línea
Chen Wang, Jingguo Lv, Yu Geng and Yiting Liu    
Highway bridges play an important role in traffic construction; however, accidents caused by bridge construction occur frequently, resulting in significant loss of life and property. The identification of bridge construction scenes not only keeps track o... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
YeEun Jang, Jae-Man Lee and JeongWook Son    
The off-site construction (OSC) method has attracted the interest of experts to resolve productivity stagnation and lack of skilled workforce and to reduce greenhouse gas emissions in the construction industry. Due to the unique characteristics of OSC pr... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Dongyeob Han, Suk Bae Lee, Mihwa Song and Jun Sang Cho    
Currently, unmanned aerial vehicles are increasingly being used in various construction projects such as housing developments, road construction, and bridge maintenance. If a drone is used at a road construction site, elevation information and orthoimage... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Clemens Kielhauser, Raul Renteria Manzano, Jeffrey J. Hoffman and Bryan T. Adey    
Unmanned Aerial Systems (UASs), which have become a key tool in remote sensing in recent years, have also rapidly entered the practice of Architecture, Engineering, Construction, and Operations (AECO). This paper presents an application study of a method... ver más
Revista: Infrastructures    Formato: Electrónico

« Anterior     Página: 1 de 2     Siguiente »