Ramin Asadi, Suzanne Wilkinson, James Olabode Bamidele Rotimi    
Rework in construction contracts is an interesting topic as it influences contractual claims and disputes. Changes in design, work scope, and construction turn into rework and affect the contract sum, the project completion date and project performance. ... ver más

 
en línea
Rong Wang, Don Amila Sajeevan Samarasinghe, Lorraine Skelton and James Olabode Bamidele Rotimi    
Design changes seem to be an inevitable part of engineering, procurement and construction EPC projects. Such changes create a need for a proactive approach to adjusting project scope, cost and time (the triple constraints) for efficiency and effectivenes... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
James Olabode Bamidele Rotimi, Chamila Ramanayaka     Pág. 13 - 30
This paper presents arguments for the development of a strategy-led approach to planning and implementation of construction projects. It takes the position that there are deficiencies in traditional planning algorithms, which make them inefficient to cop... ver más

 
en línea
Thanuja Ramachandra, James Olabode Bamidele Rotimi     Pág. 43 - 55
Payment delays and losses persist in the construction industry and continue to be a key concern to industry practitioners. Therefore an exploration of the key causes of payment delays and losses is undertaken in this study with the ultimate objective of ... ver más