Redirigiendo al acceso original de articulo en 17 segundos...
Inicio  /  Buildings  /  Vol: 12 Par: 11 (2022)  /  Artículo
ARTÍCULO
TITULO

Probabilistic Life Prediction of Tunnel Boring Machine under Wearing Conditions with Incomplete Information

Xianlei Fu    
Maozhi Wu and Limao Zhang    

Resumen

This paper developed a data analysis approach to estimate the probabilistic life of an earth pressure balance (EPB) tunnel boring machine (TBM) under wearing conditions with incomplete information. The marginal reliability function of each system component of TBM is derived based on data collected from the site. The structure of the failure framework was determined based on the evaluation of influencing factors, including the wearing of the cutter head panel and screw conveyor. The joint distribution model was built by utilizing the best-fit copula function and the remaining reliable mining distance can be predicted from this model. Real data of the remaining thickness of the wearing resistance structure of the cutter head panel and screw conveyor from an earth pressure balance (EPB) TBM were captured. A realistic metro tunneling project in China was utilized to examine the applicability and effectiveness of the developed approach. The results indicate that: (1) With the selection of normal distribution and Gumbel copula as the best-fit marginal distribution function and copula function, the reliable mining distance was predicted as 4.0834 km when the reliability equaled 0.2. (2) The copula function was necessary to be considered to assess the joint distribution of the reliability function, as the predicted mining distance reduces significantly to 3.9970 km if assumed independent. (3) It enables the user to identify the weak component in the machinery and significantly improve the reliable mining distance to 4.5075 km by increasing the initial thickness of the screw conveyor by 0.5 mm. This approach can be implemented to minimize the risk of unintended TBM breakdown and improve the tunneling efficiency by reducing unnecessary cutter head intervention during the mining process.

 Artículos similares

       
 
Sadi I. Haruna, Han Zhu, Yasser E. Ibrahim, Jianwen Shao, Musa Adamu and Abdulwarith I. B. Farouk    
The prolonged service life of civil engineering structures, such as buildings and highway pavement, means that they deteriorate with time, requiring frequent repair work. Polyurethane (PU) materials can effectively maintain engineering structures such as... ver más
Revista: Buildings

 
Francesco Asdrubali, Daniela Venanzi, Luca Evangelisti, Claudia Guattari, Gianluca Grazieschi, Paolo Matteucci and Marta Roncone    
The majority of Italian schools (70%) were built in the absence of any legislation related to energy efficiency, and therefore have very low energy performance due to aging or poor quality of construction. An energy retrofit of this building stock is nee... ver más
Revista: Buildings

 
Jinsheng Wang, Shihao Xue and Guoji Xu    
To facilitate the establishment of the probabilistic model for quantifying the vulnerability of coastal bridges to natural hazards and support the associated risk assessment and mitigation activities, it is imperative to develop an accurate and efficient... ver más
Revista: Infrastructures

 
Revista: Sustainability

 
Marco Lamperti Tornaghi, Arian Loli and Paolo Negro    
The design of new buildings, and even more the rehabilitation of existing ones, needs to satisfy modern criteria in terms of energy efficiency and environmental performance, within the context of adequate safety requirements. Tackling all these needs at ... ver más
Revista: Buildings