Redirigiendo al acceso original de articulo en 18 segundos...
ARTÍCULO
TITULO

Delays in Building Construction Projects in Ghana

Frank DK Fugar    
Adwoa B Agyakwah-Baah    

Resumen

This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

 Artículos similares

       
 
Dillip Kumar Das, Fidelis Emuze    
Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have bee... ver más

 
Morteza Hamooni, Mojtaba Maghrebi, Javad Majrouhi Sardroud and Sungjin Kim    
The concrete formwork process is a critical component of construction project control because failing to gain the necessary concrete strength can lead to reworks and, consequently, project delays and cost overruns during the project?s execution. The goal... ver más
Revista: Applied Sciences

 
Hatice Acar Yildirim,Cemil Akcay     Pág. 554 - 567
DOI: 10.7764/RDLC.18.3.554Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various ... ver más

 
Yingbo Ji, Lin Qi, Yan Liu, Xinnan Liu, Hong Xian Li and Yan Li    
Prefabricated construction has been widely accepted as an alternative to conventional cast-in-situ construction, given its improved performance. However, prefabricated concrete building projects frequently encounter significant delays. It is, therefore, ... ver más
Revista: Applied Sciences

 
Shahid Hussain, Fangwei Zhu, Zaigham Ali, Hassan Danial Aslam and Abasal Hussain    
Project delays are a large and prevalent problem in the Gilgit-Baltistan construction industry, and delays can distinctly affect project duration, budget, and also community needs. The purpose of this study is to highlight and rank delaying factors in th... ver más
Revista: Buildings